UPS SYSTEM INSTALLATION
EATON Powerware® 9395 UPS (1000–1100 kVA) Installation and Operation Manual S 164201764 Rev 1 www.powerware.com 4−39
Distributed Bypass Installation Checklist
-Each cabinet in the distributed bypass system is placed in its installed location.
-All conduits and cables are properly routed to the UPS cabinets and to the tie cabinet or distribution panel.
-All power cables are properly sized and terminated.
-Neutral conductors are installed or bonded to ground as per requirements.
-A ground conductor is properly installed.
-Controller Area Network (CAN) wiring between the UPS cabinets is properly installed.
-Pull−chain wiring between the UPS cabinets is properly installed.
-Adequate workspace exists around the UPS cabinets, the tie cabinet, and other cabinets.
-Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.