UPS SYSTEM INSTALLATION

Top Entry Conduit Landing for AC Input and Output, and DC Input (Remove panel to drill or punch conduit holes.)

TOP VIEW

Front

Interface Entry Conduit Landings for TB1 through TB3 Wiring and X−Slot Connections (Remove panels to drill or punch conduit holes.)

BOTTOM VIEW

Bottom Entry Conduit Landing for AC Input and Output, and DC Input (Remove panel to drill or punch conduit holes.)

Front

Figure 4-16. ISBM Section Conduit and Wire Entry Locations

4−18

EATON Powerware® 9395 UPS (1000–1100 kVA) Installation and Operation Manual S 164201764 Rev 1 www.powerware.com

Page 62
Image 62
Powerware 10001100 kVA operation manual Isbm Section Conduit and Wire Entry Locations