Creating New Nodes
Figure 51. Call Node Properties Dialog
Call Subroutine
Click on the
A Call to a subroutine executes the specified subroutine and then returns to the node following the Call node.
Links
Creating Links
Links are arrows that connect frames and nodes, directing the program to the next step. A Link pointing to a frame or node shows how it is accessed. A Link pointing away from a frame or node shows where the program goes next.
To create a Link, complete the following steps:
1.Select Create > Link from the menubar or press the Link button from the Program Nodes toolbar.
2.Position your cursor (the Link) on the initiating node, click and hold down the left mouse button, and drag your cursor (the Link) on to the Next Node. Release the Link. The Link is drawn using the middle of each object as an axis, regardless of the exact position of the pointer.
User’s Guide | 73 |