Q

4 – Installation Installing a Switch

Installing a SANbox2-16 switch involves the following steps:

1.Mount the switch.

2.Install SFP transceivers.

3.Connect the switch to the AC power source.

4.Connect the management workstation to the switch.

5.Install the SANbox Manager application.

6.Configure the switch.

7.Configure the ports.

8.Cable devices to the switch.

4.2.1

Mount the Switch

The switch can be placed on a flat surface and stacked or mounted in a 19” EIA rack. The top of each chassis has dimples to receive the rubber feet of a second chassis stacked on top. Without the rubber feet, the switch occupies 1U of space in an EIA rack. Mounting rails are required and available through QLogic Corporation.

WARNING!! Mount switches in the rack so that the weight is distributed evenly. An unevenly loaded rack can become unstable possibly resulting in equipment damage or personal injury.

CAUTION! If the switch is mounted in a closed or multi-unit rack assembly, make sure that the operating temperature inside the rack enclosure does not exceed the maximum rated ambient temperature. Refer to ”Switch Environmental” on page A-4.

The switch must rest on rails or a shelf in the rack or cabinet. Allow 16 cm (6.5 in) minimum clearance at the front and rear of the rack for service access and ventilation.

Do not restrict chassis air flow. Allow 16 cm (6.5 in) minimum clearance at the front and rear of the rack for service access and ventilation.

Multiple rack-mounted units connected to the AC supply circuit may overload that circuit or overload the AC supply wiring. Consider the power source capacity and the total power usage of all switches on the circuit. Refer to ”Switch Electrical” on page A-3.

Reliable grounding in the rack must be maintained from the switch chassis to the AC power source.

59021-05 B

4-3

Page 45
Image 45
Q-Logic 59021-05 B manual Mount the Switch