4 – Installation Installing a Switch
Installing a
1.Mount the switch.
2.Install SFP transceivers.
3.Connect the switch to the AC power source.
4.Connect the management workstation to the switch.
5.Install the SANbox Manager application.
6.Configure the switch.
7.Configure the ports.
8.Cable devices to the switch.
4.2.1
Mount the Switch
The switch can be placed on a flat surface and stacked or mounted in a 19” EIA rack. The top of each chassis has dimples to receive the rubber feet of a second chassis stacked on top. Without the rubber feet, the switch occupies 1U of space in an EIA rack. Mounting rails are required and available through QLogic Corporation.
WARNING!! Mount switches in the rack so that the weight is distributed evenly. An unevenly loaded rack can become unstable possibly resulting in equipment damage or personal injury.
CAUTION! If the switch is mounted in a closed or
The switch must rest on rails or a shelf in the rack or cabinet. Allow 16 cm (6.5 in) minimum clearance at the front and rear of the rack for service access and ventilation.
Do not restrict chassis air flow. Allow 16 cm (6.5 in) minimum clearance at the front and rear of the rack for service access and ventilation.
Multiple
Reliable grounding in the rack must be maintained from the switch chassis to the AC power source.