A – Command Line Interface Hotswap Command

Q

to replace? (1,2,3,4,6,7,8,9): [1] 6

o Remove all connections from the IO blade in slot 6. o Remove the IO blade in slot 6 from the chassis.

Have the above operations been completed? (y = proceed / n = cancel) y Hotswap IO blade removal sub-procedure successfully completed.

If you wish to continue with the replacement procedure please note that after the blade has been successfully inserted:

o Diagnostics will be performed on the IO blade. o The diagnostics results will be posted.

o The IO blade will be initialized to its configured state.

o All ports on the blade will be initialized to their configured state.

Do you want to continue with the replacement procedure? (y=proceed/n=cancel) y o Insert the replacement IO blade into the chassis in slot 6.

o Attach all connections, if any, to the IO blade in slot 6.

Have the above operations been completed? (y = proceed / n = cancel) y Hotswap IO blade process successfully completed.

Diagnostics has been run on the IO blade in slot 6: Passed

WARNING: Multiple alarms were posted during this process.

Execute the 'show alarm' command to see all alarms.

SANbox2 (admin) #>

Alarm Msg: [9][Fri Jun 13 01:14:42.468 2003][A3015.0001][SM][I/O blade in slot 6 has been inserted

A-18

59048-02 A

Page 132
Image 132
Q-Logic 59048-02 A manual To replace? 1,2,3,4,6,7,8,9 1