6 – Removal/Replacement | |
|
|
|
|
WARNING!!Two people are required to safely lift and install the switch into a cabinet. To avoid personal injury or damage to the switch, arrange for assistance
5.With an assistant, slide the switch into the rack. Fasten the switch brackets to the rack with screws.
6.Reconnect the Ethernet cable to the CPU module. Reconnect the power cords to the power supply modules to power up the switch.
7.Confirm the power supply module status. Do one of the following:
■Open a Telnet session and enter the Show Slot command to display the operational status of the CC blades. Refer to the ”Show Command” on page
■Observe the CC blade status in the Switch or the Blade Info data windows of the SANbox Manager faceplate display. Refer to the
Note: A “Failed” status could indicate an improperly seated or faulty blade. Enter the Show POST Log command for more information or contact your authorized maintenance provider.