4 – Installation | |
Installing a Switch | |
|
|
|
|
Installing a
1.Mount the switch.
2.Install SFP transceivers.
3.Connect the switch to the AC power source.
4.Connect the management workstation to the switch.
5.Install SANbox Manager.
6.Configure the switch.
7.Configure the ports.
8.Cable devices to the switch.
4.2.1
Mount the Switch
WARNING!! Two people are required to safely lift and install the
When mounting products into a rack or cabinet, heavier products should be placed near the bottom. A top heavy rack can become unstable possibly resulting in equipment damage or personal injury.
CAUTION! If the switch is mounted in a closed or
The switch must rest on rails or a shelf in the rack or cabinet. Allow 16 cm (6.5 in) minimum clearance at the front and rear of the rack for service access and ventilation.
Do not restrict chassis air flow. Allow 16 cm (6.5 in) minimum clearance at the front and rear of the rack for service access and ventilation.
Multiple
Reliable grounding in the rack must be maintained from the switch chassis to the AC power source.