￿

6 – Removal/Replacement

Power Supply Modules

 

Ground Jack

 

Screw

 

Release Button

 

Latch

 

Screw

Figure 6-7. Removing a Power Supply Module

6.5.2

Installing a Power Supply Module

To install a power supply module, do the following:

1.Slide the power supply module into the slot guide until it contacts the backplane.

2.Rotate the blade latch upward to lock the power supply module in place. Fasten the screws.

3.Reconnect the power cord to the power supply module and confirm that the Output Power LED illuminates.

4.Confirm the power supply module status. Do one of the following:

Open a Telnet session and enter the Show Chassis command to display the operational status of the power supply modules. Refer to the ”Show Command” on page B-44.

Observe the power supply status in the Switch data window of the SANbox Manager topology display. Refer to the SANbox2-64 Switch Management User’s Guide.

59043-01 A

6-17

Page 97
Image 97
Q-Logic SANBOX2-64 manual Installing a Power Supply Module, Removing a Power Supply Module