6)Remove the tape for leveling bolt, and take out four wood spacers from accessory box, it puts on the bottom of leveling bolts (under plastic bag), turned the leveling bolt by using the Adjustable Open End Wrench, and raised the Container Stacker.
7)Remove the four base packing.
Wood spacer | Down |
Up
Leveling bolt
8) Turned the all casters in the same direction.
Caster
9) Install the ramp to the bottom of an inclination board. (Ramp is two pieces to both sides).
ramp
Inclination board
10)Raised the leveling bolt and remove the wood spacer.
11)Carefully lift down the Container Stacker on the floor.
II
L00
Unpacking