Manuals
/
Ricoh
/
Computer Equipment
/
Printer
Ricoh
70E
installation manual
Models:
70E
1
58
122
122
Download
122 pages
11.5 Kb
55
56
57
58
59
60
61
62
Install
Black 22pin connector
Unpacking Procedures
Safety
Top Cover Interlock switch
Page 58
Image 58
11) Install the Connecting Cover(R).
12) Install the Rear cover of Printer and Finisher.
II
L
00
Preparation for Installation
4-10
Page 57
Page 59
Page 58
Image 58
Page 57
Page 59
Contents
Installation Manual
Page
Revision Table for manual Rev. for Machine No.Contents Date
Introduction
Blank
Table of Contents
Installation
Safety Summary
Safety Summary Hazard Warning Statements
Safety Summary
Unplug the Power Supply Cable prior to connecting
Installation Unit
Installation Area
Application
Environmental Conditions
Tools Required
Input Line Voltage
Unpacking of the Engine
Components in the package
Unpacking Procedures
Page
Parts Check in the Accessory Box
CD-ROM
USER’S Guide
Unpacking of the Finisher
Unpacking Procedures
Iiii
FS-104H No RoHS Compliance Unit
Joint Cover /F Joint Cover /U Joint Cover /R
Unpacking of the High Capacity Hopper
Confirmation of Parts Quantities
Page
Unpacking of the Container Stacker 1 or
Unpacking Procedures
Down
Parts Name Qty
Confirmation of the Accessories Parts
Unpacking of the Transit Pass Unit Type DDP
Sheet Relay Cable x
Unpacking of the Finisher SR5000
Preparation for Installation of the Printer
Removing the Protection Tape and Mat from the Engine
Set the PS Air Filter for the Engine Rear Cover
Removing the Protection Tape from 2000 Sheet Hopper
Removing the Protection Tape from 500 Sheet Hopper 2 portion
Preparation for Installation of the Finisher
Page
Page
Page
Page
001
001
001
Preparation for Installation of the High Capacity Hopper
Change procedure of the Paper Guide Position
Preparation for installation of the Container Stacker 1 or
001 Preparation for Installation
Preparation for Installation
Installation
Install the Guide plate/H Ass’y
Page
Page
SB Cover Paper Guide M3x6 Screw
Rear internal view of Printer View of Power Supply
Approx mm
001
Connect the connectors of Printer with the Finisher
Page
Printer
Page
SW1
Open the Front Cover and Lower paper guide
Insert the two Projections in the Gap
Check
Black 22pin connector
P.S
Install the Ground Plate to the Transit Pass Unit Type DDP
M4x8 Screw Front door
Page
Page
M4 Screw
Connection of the Engine and Container Stacker 1 or
Guide Plate L Guide Plate U View from front side
M4 screws Rear cover
Leveling bolts 001
Check the Gaps of A,B,C,D are nearly equal each other
No RoHS Compliance
Engine
Container
Page
Connection of the Container Stacker 1 and Container Stacker
Container stacker M4x12 screws
Check
RoHS Compliance Unit
M4 screws Rear Cover Engine Container Stacker
M4 screws M3 screws
Install the Standard Finisher to the Container Stacker
Printer
001
Upper view
Page
Offmkk SW1
6 7
SB Cover Paper Guide M3x6 Screw
Open the Front Cover and Lower paper guide
Container Stacker Cover
Check
Black 22pin connector GND cable
SW2 SW1
Install the Ground Plate to the Transit Pass Unit Type DDP
Finisher SR5000 FC Cover
Checks
Confirmation of the paper size indication
Page
Button twice, and return to the main menu screen
Printing of the status reports
Check the print contamination
Confirmation of the stapling
Adjustment of paper feeding position of Tray
Top Cover Interlock switch
Entrance paper guide
Appendix 1.Installation Area Information
2850 2565 700 665 1200 1000
Page
3270 700 622 2565 671
700 665 1200
3886
Page
700 6651200
3468
Page
1215
700 889
672 728 1200 2600
1000
3104 889
3722 700 650
1157
1000 650 4022 1157 1215
728 1200 2600
Appendix 2. Locations of the Leveling Bolt and Caster
Caster Circling Dia Leveling Bolt Dia Operator’s Side
Top
Page
Image
Contents