
Table of Contents
SAFETY SUMMARY
1.General Safety Guidelines ………………………………………………………………….
2.Hazard Warning Statements ………………………………………………………………
CHAPTER 1. INSTALLATION REQUIREMENTS | ||
1.1 | APPLICATION | |
1.2 | INSTALLATION AREA | |
1.3 | INSTALLATION UNIT | |
1.4 | TOOLS REQUIRED | |
1.5 | ENVIRONMENTAL CONDITIONS | |
1.6 | INPUT LINE VOLTAGE |
CHAPTER 2. UNPACKING | ||
2.1 UNPACKING OF THE ENGINE | ||
2.1.1 Components in the package | ||
2.1.2 | Unpacking Procedures | |
2.1.3 Parts Check in theAccessory Box | ||
2.2 UNPACKING OF THE FINISHER | ||
2.2.1 Components in the package | ||
2.2.2 | Unpacking Procedures | |
2.2.3 Parts Check in theAccessory Box | ||
2.3 UNPACKING OF THE HIGH CAPACITY HOPPER | ||
2.3.1 Confirmation of Parts Quantities | ||
2.3.2 | Unpacking Procedures | |
2.4 UNPACKING OF THE CONTAINER STACKER 1 OR 2 | ||
2.4.1 Confirmation of Parts Quantities | ||
2.4.2 | Unpacking Procedures | |
2.4.3 Parts Check in theAccessory Box | ||
2.5 UNPACKING OF THE TRANSIT PASS UNIT TYPE DDP | ||
2.5.1 Confirmation of Parts Quantities | ||
2.5.2 Confirmation of the Accessories Parts | ||
2.5.3 | Unpacking Procedures | |
2.6 UNPACKING OF THE FINISHER SR5000 | ||
2.6.1 Confirmation of Parts Quantities | ||
2.6.2 | Unpacking Procedures |
CHAPTER 3. PREPARATION FOR INSTALLATION | |
3.1 PREPARATION FOR INSTALLATION OF THE PRINTER |
II
L
01
Table of Contents i