6)Install the Container Stacker 1 to the Container Stacker 2. The screw is the thing of the temporary stopping.
Container stacker 1
M4x12 screws
M4x12 screws
Container stacker 2
M4x12 screws | Frame projection part |
7)In order to adjust the height of Container stacker, turn 180 degrees each of four leveling bolts, and satisfy the following conditions, and bolt the screw of a temporary tight.
(1)When Front cover R is shut and it looks into the space between Container stacker 2 and Container stacker 1 from a front side, the height of the Frame’s projection of
Container stacker and the Guide plate U’s projection is the same. [Note] As for the way of opening front cover L, refer to the item 3.3.
Stacker frame | Guide plate U |
Level Meter
Projection
Projection
Front cover R
Same height
Connection part details
Leveling bolt
Front cover L
|