Sun Microsystems Virtual Tape Library manual Next task Creating a reclamation policy on

Models: Virtual Tape Library

1 292
Download 292 pages 53.18 Kb
Page 61
Image 61

Managing virtual libraries

2.To migrate data when ALL of of the conditions specified are satisfied, click the And radio button (B below).

A

BC

D

E

F

G

H

J

3.To migrate data when ONE OR MORE of the conditions specified is satisfied, click the the Or radio button (C above).

4.To trigger migration based on the age of the data, check the Age Based check box, and use the spinner control to select the desired number of days (D above).

5.To trigger migration based on disk usage, check the Disk Capacity Based check box (E above).

6.To trigger migration based on the end of a backup job, check the End of Backup check box (F above). If you want the end of a backp job to trigger migration only when a tape is full, also check the Only When Tape Is Full check box

(G above).

7.To delay migration for a specified period following another triggering event, check the check Delay Migration Unitl check box, and enter the number of hours and minutes for the dealy in the box provided (H above).

8.Press Next (J above).

Next task: “Creating a reclamation policy” on page 48.

96267 • G

Chapter 4 VTL operations 47

Page 61
Image 61
Sun Microsystems Virtual Tape Library manual Next task Creating a reclamation policy on