10. Defrost control

10. Defrost control

QIn heating operation, defrost operation is performed when TE sensor temperature satisfies any condition in A zone to D zone.

RThe defrost operation is immediately finished if TE sensor temperature has become 12°C or more, or it also is finished when condition of 7°C < TE < 12°C has continued for 1 minute. The defrost operation is also finished when defrost operation has continued for 10 minutes even if TE sensor temperature has become 7°C or lower.

SAfter defrost operation has finished, the compressor and the outdoor fan start heating operation after stopped for approx. 50 seconds.

Start of heating operation

0

10

15

c

b

a

d [min.]

TE [˚C]

 

 

 

 

 

 

 

 

 

 

 

 

–5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A zone

–10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

–13

 

 

 

 

 

 

 

 

B zone

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

–18

 

 

 

 

 

 

 

 

 

D zone

 

 

 

 

 

 

C zone

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* The minimum TE value between 10 and 15 minutes after heating operation has started is stored in memory as TE0.

A zone

Defrost operation is performed in this zone when TE0-TE > 3 continued for T seconds.

B zone

Defrost operation is performed in this zone when TE0-TE > 3 continued for T seconds.

C zone

Defrost operation is performed when this zone continued for T seconds.

 

 

 

D zone

Defrost operation is performed when this zone continued for T seconds.

 

 

 

 

 

 

 

SM160

 

 

 

 

a

55

 

 

 

 

b

45

 

 

 

 

c

40

 

 

 

 

d

150

 

 

 

 

T

20

 

 

 

 

– 68 –

Page 68
Image 68
Toshiba RAV-SM1603DT-A, RAV-SM1603ATZG-E, RAV-SM1603ATZ-E, RAV-SM1403DT-A Defrost control, Start of heating operation