No. Part name

 

Procedure

Remarks

 

 

 

 

Control P.C.

1)

Remove the inverter box from P.C. board base.

Inverter box (Metal sheet)

board

2)

Disconnect lead wires and connectors con-

assembly

 

 

nected from the control P.C. board assembly to

 

 

 

other parts.

 

1.Lead wires:

With the power terminal block: 2 pcs. (Single phase) (Red, White)

With the compressor: 3 pcs.

P.C. board

(Red, White, Black)

base

2. Connectors

 

CN301 : Outdoor fan (3P, White) *Note 1)

 

CN300 : Position detection (5P, White)

 

CN700 : 4-way valve (3P, Yellow) *Note 1)

Cycle control

CN702 : PMV coil (6P, White)

P.C. board

assembly

CN600 : TD sensor (3P, White)

Inverter

 

control

CN605 : TS sensor (3P, White) *Note 1)

P.C. board

CN604 : TE sensor (2P, White) *Note 1)

assembly

 

CN601 : TO sensor (2P, White)

Cycle control

CN02 : Indoor/Outdoor connecting

P.C. board

terminal block (2P, Black)

assembly

CN500 : Case thermo (2P, White) *Note 1)

 

CN14, CN15 : Reactor (3P, Relay

 

connector, Blue) *Note 1)

 

*Note 1)

 

Remove the connector while releasing locking of

 

the housing.

 

3) Remove the control P.C. board assembly from

Inverter

P.C. board base. (Remove the heat sink and

control

the inverter control P.C. board assembly as

P.C. board

assembly

they are screwed.)

 

Note 2)

 

Remove the heat sink upward by taking off two

 

claws of P.C. base and holding the heat sink.

 

4) Take off three screws fixing the heat sink to the

Inverter

control

control P.C. board assembly.

P.C. board

5) Mount a new control P.C. board assembly.

assembly

 

Note 3)

Groove for

When mounting a new board, check that it is

P.C. boaed

correctly set in the groove of the base holder of

 

P.C. board base.

 

Heat sink

Inverter box

(Metal sheet)

 

– 75 –

Page 77
Image 77
Toshiba RAV-SM560XT-E, RAV-SM800XT-E service manual … Control P.C Remove the inverter box from P.C. board base