UPS Operation 4
Use the following procedure to reinstall the UPS and transfer the critical load from Maintenance Bypass (AC Line operation) to the UPS:
Reconnect the battery modules to the battery connector on the UPS rear panel.
Turn the circuit breaker on all battery modules to the ON ( ) position.
Plug the Y+cord of the Bypass Module into the power connectors on the UPS as shown in Figure18.
i NOTE Steps 4 through 7 are for changing the output voltage. The output voltage is factory(configured for 230V. If you do not need to change the UPS output voltage, skip to Step8. Use the following table to select the correct output voltage according to your Bypass Module.
Bypass Module | UPS Voltage Selection* |
Model Number |
|
|
|
604Hz BDM 208: 120/208 | 208 |
|
|
604Hz BDM 208: 120/240 | 208 |
|
|
604Hz BDM 208: 120 | 208 |
|
|
604Hz BDM 240: 120/240 | Set to 220V for 110/220V BDM output |
| Set to 230V for 115/230V BDM output |
| Set to 240V for 120/240V BDM output |
|
|
604Hz BDM 240: 120 | Set to 220V for 110V BDM output |
| Set to 230V for 115V BDM output |
| Set to 240V for 120V BDM output |
|
|
504Hz BIM 208 Model 2500 only | 208 |
|
|
504Hz BIM 220 | 220 |
|
|
504Hz BIM 230 | 230 |
|
|
504Hz BIM 240 | 240 |
*The UPS output voltage should be set according to local mains voltage.
4Press the Output Off button until the alarm beeps. All indicators flash simultaneously.
Lucent Technologies Model 3000 UPS Operators Manual 16744054119 Issue 3 | 43 |