User Manual
Hipulse - Single Phase ‘1+N’ UPS System | 130 kVA - 110V |
BATTERY C.B. OPEN
hh.mm.ss dd.mm.yy
>MEASUREMENT |
| < |
FUNCTION |
|
|
MAINTENANCE |
|
|
SETUP |
|
|
|
|
|
|
|
|
OUTPUT |
|
|
INPUT |
|
|
>BATTERY |
| < |
TEMPERATURE |
|
|
|
|
|
|
|
|
BATTERY |
|
|
VOLTAGE | 446 | [V] |
CURRENT | 001 | [A] |
CHARGE | 000 | [%] |
|
|
|
NORMAL OPERATION
hh.mm.ss dd.mm.yy
3.Close the Rectifier input power switch Q1 and UPS output power switch Q4.
After approximately 20 seconds the Module Mimic led’s will change so that the Load on inverter will light
4.Before closing the battery circuit breaker check the d.c.
Select MEASUREMENT and press ENTER key
Select BATTERY and the d.c. busbar voltage will be displayed.
If the voltage indicated is satisfactory (432V d.c. for 380V a.c. system, 446V d.c. for 400V a.c. system, and 459V d.c. for a 415V a.c. system ) press the escape key repeatedly until the display returns to the original window.
5. Manually close the battery circuit breaker.
The Module Mimic inidicator (3) Battery unavailable should extinguish. Several led’s on the Battery state of charge bargraph (17) will illuminate showing battery state of charge.
When the battery circuit breaker has been closed and the inverter has stabilized the screen will change to the default window.
Default window:
The message shown below, will be seen on the default screen whenever the UPS is operating normally.
The top lines display the UPS operational status and indicates alarm conditions when they occur; and the bottom line shows the time and day.
The UPS is operating normally with its inverter supplying the load.
Follow the foregoing procedure for the other UPS.
For a system configured in the “1+N system”, the ‘N’ UPS modules will simultaneously change from “load on bypass” to “load on inverter” provided that a sufficient number of modules are running, and
68