User Manual
Hipulse - Single Phase ‘1+N’ UPS System | 130 kVA - 110V |
8.3Operating Instruction
Starting and stopping the ‘1+N’ system is the same as a single module, however the module’s response depends on whether it is configured on the menu of the Operator Control Panel.
8.3.1System Start-up and shutdown procedures (Separate Batteries)
WARNING
If differential circuit breakers are used on UPS unit inputs, use a common device only on the system’s bypass mains. At the instant of electrical connection, the current may not be split instantaneously and this may cause the residual current
These operations must be performed one at a time, progressing to the next step only after having completed the previous step on both UPS modules.
8.3.1.1 System Start-up
This procedure should be followed when tuning on the UPS from a fully powered down condition – i.e. where the load is not being initially supplied at all. It is assumed that the installation is complete, the system has been commissioned by authorized personnel and the external power isolators are closed.
EMERSON NETWORK POWER
UPS
RECTIF. SWITCH OPEN BATTERY C.B. OPEN MANUAL BYPASS CLOSED
hh.mm.ss dd.mm.yy
1.Open the UPS door(s) to gain access to the main power switches.
WARNING
The following action will apply power to the load equipment, ensure it is safe to do.
2. Close the Bypass power switch Q2
The Module Mimic LED’s will indicate Bypass supply healthy
The display screen will show the following:
Initializing Window:
After first connecting power to the UPS and closing the Q2 isolator, this message will appear on the LCD screen. It persists for about five seconds while the control firmware is loaded. It is followed by a screen showing various messages with the time and date on the bottom line.
Note: If input power is present but the display remains blank, then the Micro controller is not working, pleas contact your dealer for advice.
67