User Manual
Hipulse - Single Phase ‘1+N’ UPS System | 130 kVA - 110V |
8.3.1.5 Switching ON a UPS that was previously switched OFF and isolated from the system.
1.Close the
2.Close the switches Q1 (rectifier input) and Q2 (bypass input) of the UPS.
3.Select the MEASUREMENT function from the display on the main menu, then press ENTER and select BATTTERY. Press ENTER and check that the voltage level has reached the rated value (432V or 446 or 459 in accordance with no. of battery blocks).
4.Close the battery
5.Close the UPS switch Q4 (output), wait about 20 seconds and check the message NORMAL OPERATION appearing on the display operator panel.
8.3.1.6 Complete system shutdown
Follow the procedure described in Chapter 5 - Operating Instruction : paragraph 5.6 by working on several UPS modules.
8.3.1.7 Complete system reset
Follow the procedure described in Chapter 5 - Operating Instruction : paragraph 5.7 by working on several UPS modules.
8.4Display Panel message interpretation in '1+N' System
The alarms are the same as for the single module, as given in the previous paragraph, with the additional alarms:
CODE | DISPLAY ALARM MESSAGE | INTERPRETATION |
44 | INV: PARALLEL ERROR | The parallel board has detected a wrong sharing of the load and |
|
| has blocked its inverter. Seek qualified assistance. |
46 | NR: INVERTERS NOT OK. | The number of active inverters is below the preset capacity value. |
70