American Power Conversion PX user manual Ground Wiring Terminal Block

Page 31

Chapter 4 - Electrical Requirements and Procedures

Ground Wiring Terminal Block

Input Wiring Terminal Block

Fig 4-2 Ground Wiring and Input Wiring Terminal Blocks

6.Connect the ground wire to the ground wiring terminal block. See figure 4-3. Make sure there are no loose strands and the terminal connection screw is sufficiently tightened.

Input Ground Wire

Existing Wiring

Fig 4-3 Ground Hardwiring Connection

7.Feed the L1 and Neutral wires through the wiring pathway hole to the input wiring terminal block. See figure 4-4 for the input wiring pathway.

gFi

4-4 Input Wiring Pathway

8.Connect input wires to the input terminal block connec- tions labeled “L1” and “N” as shown in figure 4-5. Make sure there are no loose strands and that the terminal connection screws are sufficiently tightened.

L1 Wire

Neutral Wire

Existing Wiring

Fig 4-5 Input Hardwiring Connections

9.Carefully fold the excess wiring into the entry compart- ment. After the electrical wiring test/checklist at the end of this chapter is completed, replace the input wiring panels.

4-3

Image 31
Contents Page 0660 Main Tech Support+353 91 Toll-Free NumbersRadio Frequency Interference Important Safety InstructionsLife Support Policy Limited WarrantyTable of Contents Index MiniFrame MasterFrame IntroductionTheory of Operation Power Processing Battery SourceFig I-2 Functional Diagram of a SymmetraTM Thank You SymmetraTM OverviewBattery Source Power Processing SystemControl/User Interface On-Line Operating Mode Load-Disconnect ModeModes of Operation Bypass Operating Mode On-Battery Operating ModeImportant Information DefinitionsPage Important Safety Information Safety InformationSafety Earth Ground Indicates the pri- mary safety ground Symbols Used In This ManualSafety-2 Physical Representation Bays Power Array FrameFive Four Power Battery ModulePower Module Powerview User InterfacePower Module Battery ModuleInput Circuit Breaker Maintenance Bypass SwitchMain Intelligence Module MIM Redundant Intelligence Module RIMRear View of a Power Array Site Preparation BTU Output Space and Weight ConsiderationsTransporting Power Array to Installation Site Operating ConditionsSite Preparation Unpacking and Installing Frame Check For Damage Dimensions WeightInitial Inspection Move the FrameRemove Packing Materials Moving Battery & Power ModulesRemove the Frame from the Pallet Wiring Requirements & Procedures Repo Switch Wiring SymmetraTM WiringInput Wiring Output WiringInput Wiring Specifications Input WiringInput Wiring Procedures Ground Wiring and Input Wiring Terminal Blocks Ground Wiring Terminal BlockOutput Wiring Installation Output WiringCable Specifications Remote Emergency Power Off SwitchRepo Specifications Repo Switch InstallationVdc Repo Switch Connection Electrical Wiring TestElectrical Wiring Test/Checklist Contact Closure Repo Switch Connection11 Startup Screen Record the PowerView reportedSetting Up The Power Array Positions Setup of Power ArrayFrame Leveling Procedure Removing Grill CoversBattery Module Location of Battery Module Bays Installing the Battery ModulesProcedure for Battery Module Installation Clear all battery module bays of any debrisProcedure for Power Module Installation Installing the Power Modules10 Location of the MIM and RIM Installing the Main Intelligence Module MIMInstalling the Redundant Intelligence Module RIM Main Intelligence ModuleRemove the grill cover from the top level of the frame Installing the PowerView InterfaceRemote Placement of the PowerView Wall Mounting the PowerViewSmartSlotTM Interface Accessories Installation Test/Checklist Installation TestSymmetraTM Power Module/Frame Capacities Power Reported21 Miscellaneous Status Screen 22 Power The Load Sequence 25 Return to On-Line Mode System Setup PowerView Display PowerView Functions Physical Features of the PowerviewPowerView Interface Navigation Keys PowerView LED IndicatorsSymbol Name Function of Key On Key EscStatus Startup ScreenTop-Level Menu Screen ControlLogging SetupAccessories DiagnosticsConfiguring & Operating the SymmetraTM Introduction Powering the Power ArrayLoad With No Redundancy Status Screen Powering the LoadsReview Status Conditions Voltage Status ScreenPower Status Screen Load With Redundancy Status Screen Battery Status ScreenFrequency Status Screen Miscellaneous Status Screen Alarm Threshold Status Screen11 Sample Alarm Threshold Status Screen Perform a Self TestShutdown Parameter Selection Screen Configure AlarmsAlarm Thresholds Selection Screen Switching Audible Alarm Beeper OffEvent Log Screen Review Diagnostic InformationDiagnostics Menu Screen Review Logging MenuModule Replacement Module Failure Alarm Indicators Module ReplacementReturning Modules to APC Installing the Replacement Module Battery Module ReplacementReplacement Battery Module Verification Replacement Module Verification Power Module ReplacementRefer to for the power module installation proce- dure Installing the Replacement Redundant Intelligence Module Redundant Intelligence Module ReplacementInstalling the Replacement Main Intelligence Module Replacement MIM VerificationPowerView Interface Messages MIM detects the RIM before PowerView Meaning Corrective Action Message Start-UpRIM is awake Has been corrected either because PowerView Meaning Corrective Action Message# of batteries decreased Load is No Longer aboveRedundancy-select Setup-Alarms-RedundancyThreshold. Startup-Setup-Alarms Select zeroBecause of a power failure, wait for Battery modules are beingSupport. See inside front cover PowerView Display Messages Index Electro-static discharge, 2-1 Emergency power off Configuring PowerView Threshold statusDescription Frame, 2-1 Modules ConfiguringDescription, 1-4 Installation Ordering information Checklist Input Output Overview RepoReplacement Modules & Accessories English Text