Chapter 2 - Site Preparation
2-2
Page 23
Page 25
Image 24
Page 23
Page 25
Contents
Page
Main Tech Support
+353 91
Toll-Free Numbers
0660
Important Safety Instructions
Radio Frequency Interference
Limited Warranty
Life Support Policy
Table of Contents
Index
Introduction
MiniFrame MasterFrame
Power Processing Battery Source
Fig I-2 Functional Diagram of a SymmetraTM
Thank You SymmetraTM Overview
Theory of Operation
Power Processing System
Battery Source
Control/User Interface
Load-Disconnect Mode
On-Line Operating Mode
Modes of Operation
On-Battery Operating Mode
Bypass Operating Mode
Definitions
Important Information
Page
Safety Information
Important Safety Information
Symbols Used In This Manual
Safety Earth Ground Indicates the pri- mary safety ground
Safety-2
Physical Representation
Power Array Frame
Five Four Power Battery
Module
Bays
Powerview User Interface
Power Module
Battery Module
Power Module
Maintenance Bypass Switch
Main Intelligence Module MIM
Redundant Intelligence Module RIM
Input Circuit Breaker
Rear View of a Power Array
Site Preparation
Space and Weight Considerations
Transporting Power Array to Installation Site
Operating Conditions
BTU Output
Site Preparation
Unpacking and Installing Frame
Dimensions Weight
Initial Inspection
Move the Frame
Check For Damage
Moving Battery & Power Modules
Remove Packing Materials
Remove the Frame from the Pallet
Wiring Requirements & Procedures
SymmetraTM Wiring
Input Wiring
Output Wiring
Repo Switch Wiring
Input Wiring
Input Wiring Specifications
Input Wiring Procedures
Ground Wiring Terminal Block
Ground Wiring and Input Wiring Terminal Blocks
Output Wiring
Output Wiring Installation
Remote Emergency Power Off Switch
Repo Specifications
Repo Switch Installation
Cable Specifications
Electrical Wiring Test
Electrical Wiring Test/Checklist
Contact Closure Repo Switch Connection
Vdc Repo Switch Connection
Record the PowerView reported
11 Startup Screen
Setting Up The Power Array
Setup of Power Array
Frame Leveling Procedure
Removing Grill Covers
Positions
Installing the Battery Modules
Procedure for Battery Module Installation
Clear all battery module bays of any debris
Battery Module Location of Battery Module Bays
Installing the Power Modules
Procedure for Power Module Installation
Installing the Main Intelligence Module MIM
Installing the Redundant Intelligence Module RIM
Main Intelligence Module
10 Location of the MIM and RIM
Installing the PowerView Interface
Remote Placement of the PowerView
Wall Mounting the PowerView
Remove the grill cover from the top level of the frame
SmartSlotTM Interface Accessories
Installation Test
Installation Test/Checklist
Power Reported
SymmetraTM Power Module/Frame Capacities
21 Miscellaneous Status Screen 22 Power The Load Sequence
25 Return to On-Line Mode
System Setup
PowerView Display
Physical Features of the Powerview
PowerView Functions
PowerView Interface
PowerView LED Indicators
Symbol Name Function of Key On Key
Esc
Navigation Keys
Startup Screen
Top-Level Menu Screen
Control
Status
Setup
Accessories
Diagnostics
Logging
Configuring & Operating the SymmetraTM
Powering the Power Array
Introduction
Powering the Loads
Review Status Conditions
Voltage Status Screen
Load With No Redundancy Status Screen
Load With Redundancy Status Screen Battery Status Screen
Power Status Screen
Frequency Status Screen
Alarm Threshold Status Screen
11 Sample Alarm Threshold Status Screen
Perform a Self Test
Miscellaneous Status Screen
Configure Alarms
Alarm Thresholds Selection Screen
Switching Audible Alarm Beeper Off
Shutdown Parameter Selection Screen
Review Diagnostic Information
Diagnostics Menu Screen
Review Logging Menu
Event Log Screen
Module Replacement
Module Replacement
Module Failure Alarm Indicators
Returning Modules to APC
Battery Module Replacement
Installing the Replacement Module
Replacement Battery Module Verification
Power Module Replacement
Replacement Module Verification
Refer to for the power module installation proce- dure
Redundant Intelligence Module Replacement
Installing the Replacement Main Intelligence Module
Replacement MIM Verification
Installing the Replacement Redundant Intelligence Module
PowerView Interface Messages
PowerView Meaning Corrective Action Message Start-Up
MIM detects the RIM before
RIM is awake
PowerView Meaning Corrective Action Message
# of batteries decreased
Load is No Longer above
Has been corrected either because
Setup-Alarms-Redundancy
Threshold. Startup-Setup-Alarms
Select zero
Redundancy-select
Battery modules are being
Because of a power failure, wait for
Support. See inside front cover
PowerView Display Messages
Index
Configuring PowerView Threshold status
Electro-static discharge, 2-1 Emergency power off
Description
Configuring
Description, 1-4 Installation Ordering information
Checklist Input Output Overview Repo
Frame, 2-1 Modules
Replacement Modules & Accessories
English Text
Related pages
Troubleshooting Guide for GE 27851 Series
Specifications for Plasmon V15
Wi-Fi indicator light is orange for Lexmark 7500 Series
Displaying a Trend Link Chart During Logging for Fluke 2645A
When Using the Warming Drawer for GE RB525
FACTORY-INSTALLED Options for York DJ 180
− Parts List for Miller Electric RHC-14
TV Brand Code List for Samsung HTDB760TH/UMG
Where can I find the user handbook for the DCS 400?
Access the Dynacord DCS 400 handbook
Top
Page
Image
Contents