American Power Conversion PX user manual Module Replacement, MiniFrame MasterFrame

Page 59

Chapter Eight

Module Replacement

The modular components of the Power Array are user replaceable. This chapter provides procedures for identifying and replacing a failed module. It also provides procedures for verifying that a replacement module is installed and functioning properly.

MiniFrame

MasterFrame

Image 59
Contents Page 0660 Main Tech Support+353 91 Toll-Free NumbersRadio Frequency Interference Important Safety InstructionsLife Support Policy Limited WarrantyTable of Contents Index MiniFrame MasterFrame IntroductionTheory of Operation Power Processing Battery SourceFig I-2 Functional Diagram of a SymmetraTM Thank You SymmetraTM OverviewControl/User Interface Power Processing SystemBattery Source Modes of Operation Load-Disconnect ModeOn-Line Operating Mode Bypass Operating Mode On-Battery Operating ModeImportant Information DefinitionsPage Important Safety Information Safety InformationSafety Earth Ground Indicates the pri- mary safety ground Symbols Used In This ManualSafety-2 Physical Representation Bays Power Array FrameFive Four Power Battery ModulePower Module Powerview User InterfacePower Module Battery ModuleInput Circuit Breaker Maintenance Bypass SwitchMain Intelligence Module MIM Redundant Intelligence Module RIMRear View of a Power Array Site Preparation BTU Output Space and Weight ConsiderationsTransporting Power Array to Installation Site Operating ConditionsSite Preparation Unpacking and Installing Frame Check For Damage Dimensions WeightInitial Inspection Move the FrameRemove the Frame from the Pallet Moving Battery & Power ModulesRemove Packing Materials Wiring Requirements & Procedures Repo Switch Wiring SymmetraTM WiringInput Wiring Output WiringInput Wiring Procedures Input WiringInput Wiring Specifications Ground Wiring and Input Wiring Terminal Blocks Ground Wiring Terminal BlockOutput Wiring Installation Output WiringCable Specifications Remote Emergency Power Off SwitchRepo Specifications Repo Switch InstallationVdc Repo Switch Connection Electrical Wiring TestElectrical Wiring Test/Checklist Contact Closure Repo Switch Connection11 Startup Screen Record the PowerView reportedSetting Up The Power Array Positions Setup of Power ArrayFrame Leveling Procedure Removing Grill CoversBattery Module Location of Battery Module Bays Installing the Battery ModulesProcedure for Battery Module Installation Clear all battery module bays of any debrisProcedure for Power Module Installation Installing the Power Modules10 Location of the MIM and RIM Installing the Main Intelligence Module MIMInstalling the Redundant Intelligence Module RIM Main Intelligence ModuleRemove the grill cover from the top level of the frame Installing the PowerView InterfaceRemote Placement of the PowerView Wall Mounting the PowerViewSmartSlotTM Interface Accessories Installation Test/Checklist Installation Test21 Miscellaneous Status Screen 22 Power The Load Sequence Power ReportedSymmetraTM Power Module/Frame Capacities 25 Return to On-Line Mode System Setup PowerView Display PowerView Interface Physical Features of the PowerviewPowerView Functions Navigation Keys PowerView LED IndicatorsSymbol Name Function of Key On Key EscStatus Startup ScreenTop-Level Menu Screen ControlLogging SetupAccessories DiagnosticsConfiguring & Operating the SymmetraTM Introduction Powering the Power ArrayLoad With No Redundancy Status Screen Powering the LoadsReview Status Conditions Voltage Status ScreenFrequency Status Screen Load With Redundancy Status Screen Battery Status ScreenPower Status Screen Miscellaneous Status Screen Alarm Threshold Status Screen11 Sample Alarm Threshold Status Screen Perform a Self TestShutdown Parameter Selection Screen Configure AlarmsAlarm Thresholds Selection Screen Switching Audible Alarm Beeper OffEvent Log Screen Review Diagnostic InformationDiagnostics Menu Screen Review Logging MenuModule Replacement Returning Modules to APC Module ReplacementModule Failure Alarm Indicators Replacement Battery Module Verification Battery Module ReplacementInstalling the Replacement Module Refer to for the power module installation proce- dure Power Module ReplacementReplacement Module Verification Installing the Replacement Redundant Intelligence Module Redundant Intelligence Module ReplacementInstalling the Replacement Main Intelligence Module Replacement MIM VerificationPowerView Interface Messages RIM is awake PowerView Meaning Corrective Action Message Start-UpMIM detects the RIM before Has been corrected either because PowerView Meaning Corrective Action Message# of batteries decreased Load is No Longer aboveRedundancy-select Setup-Alarms-RedundancyThreshold. Startup-Setup-Alarms Select zeroBecause of a power failure, wait for Battery modules are beingSupport. See inside front cover PowerView Display Messages Index Description Configuring PowerView Threshold statusElectro-static discharge, 2-1 Emergency power off Frame, 2-1 Modules ConfiguringDescription, 1-4 Installation Ordering information Checklist Input Output Overview RepoReplacement Modules & Accessories English Text