American Power Conversion PX user manual Replacement Modules & Accessories

Page 74

SymmetraTM Power Array Dealers:

(Replacement Modules & Accessories)

APC Europe

 

 

APC Nordic

 

 

APC Europe Headquarters

Telephone

+46

8 6429710

Ballybrit Business Park

Fax

+46

8 6424727

Galway, Ireland

 

 

 

 

Telephone

+353 91 702000

APC Novosibirsk

 

 

Fax

+353 91 756909

Telephone

+7 3832 32 00 05

 

 

 

Fax

+7 3832 39 75 75

APC Balkans

 

 

 

 

 

Telephone

+33

1 64625926

APC Poland

 

 

Fax

+33

1 60176551

Telephone

+48

22 666 00 11

 

 

 

Fax

+48

22 666 00 22

APC Benelux

 

 

Infoline

0 800 25252

Telephone

+31

183 628 898

 

 

 

Fax

+31

183 628 821

APC Spain & Portugal

 

 

 

 

Telephone

+34

3 4127125

APC Czech & Slovak Republic

 

+34 3 3180133

Telephone

+420 2 683 7845

Fax

+34

3 4127125

Fax

+420 2 683 7680

 

+34 3 3177646

APC France

 

 

APC Turkey

 

 

Telephone

+33

1 41 90 52 00

Telephone

+90

212 230 7156

 

+0800 39 32 03

Fax

+90

212 230 7113

Fax

+33

1 41 90 52 88

 

 

 

 

 

 

APC Ukraine

 

 

APC Germany

 

 

Telephone

+380 44 2969409

Telephone

+49

89 51417 0

Fax

+380 44 2955292

Fax

+49

89 51417 100

 

 

 

 

 

 

APC United Kingdom

 

 

APC Hungary

 

 

Telephone

+44

1753 511 022

Telephone

+36

1 2696433

Fax

+44

1753 511 033

Fax

+36

1 2696433

 

 

 

 

 

 

APC E-Mail & Internet

 

APC Italy

 

 

Internet

http://www.apcc.com

Telephone

+39

229 40 55 08

E-Mail

apcinfo@apcc.com

Fax

+39

229 40 55 15

 

apcinlam@apcc.com

APC Moscow

 

 

 

 

 

Telephone

+7 095 929 90 95

 

 

 

Fax

+7 095 929 91 80

 

 

 

Image 74
Contents Page Toll-Free Numbers Main Tech Support+353 91 0660Important Safety Instructions Radio Frequency InterferenceLimited Warranty Life Support PolicyTable of Contents Index Introduction MiniFrame MasterFrameThank You SymmetraTM Overview Power Processing Battery SourceFig I-2 Functional Diagram of a SymmetraTM Theory of OperationControl/User Interface Power Processing SystemBattery Source Modes of Operation Load-Disconnect ModeOn-Line Operating Mode On-Battery Operating Mode Bypass Operating ModeDefinitions Important InformationPage Safety Information Important Safety InformationSymbols Used In This Manual Safety Earth Ground Indicates the pri- mary safety groundSafety-2 Physical Representation Module Power Array FrameFive Four Power Battery BaysBattery Module Powerview User InterfacePower Module Power ModuleRedundant Intelligence Module RIM Maintenance Bypass SwitchMain Intelligence Module MIM Input Circuit BreakerRear View of a Power Array Site Preparation Operating Conditions Space and Weight ConsiderationsTransporting Power Array to Installation Site BTU OutputSite Preparation Unpacking and Installing Frame Move the Frame Dimensions WeightInitial Inspection Check For DamageRemove the Frame from the Pallet Moving Battery & Power ModulesRemove Packing Materials Wiring Requirements & Procedures Output Wiring SymmetraTM WiringInput Wiring Repo Switch WiringInput Wiring Procedures Input WiringInput Wiring Specifications Ground Wiring Terminal Block Ground Wiring and Input Wiring Terminal BlocksOutput Wiring Output Wiring InstallationRepo Switch Installation Remote Emergency Power Off SwitchRepo Specifications Cable SpecificationsContact Closure Repo Switch Connection Electrical Wiring TestElectrical Wiring Test/Checklist Vdc Repo Switch ConnectionRecord the PowerView reported 11 Startup ScreenSetting Up The Power Array Removing Grill Covers Setup of Power ArrayFrame Leveling Procedure PositionsClear all battery module bays of any debris Installing the Battery ModulesProcedure for Battery Module Installation Battery Module Location of Battery Module BaysInstalling the Power Modules Procedure for Power Module InstallationMain Intelligence Module Installing the Main Intelligence Module MIMInstalling the Redundant Intelligence Module RIM 10 Location of the MIM and RIMWall Mounting the PowerView Installing the PowerView InterfaceRemote Placement of the PowerView Remove the grill cover from the top level of the frameSmartSlotTM Interface Accessories Installation Test Installation Test/Checklist21 Miscellaneous Status Screen 22 Power The Load Sequence Power ReportedSymmetraTM Power Module/Frame Capacities 25 Return to On-Line Mode System Setup PowerView Display PowerView Interface Physical Features of the PowerviewPowerView Functions Esc PowerView LED IndicatorsSymbol Name Function of Key On Key Navigation KeysControl Startup ScreenTop-Level Menu Screen StatusDiagnostics SetupAccessories LoggingConfiguring & Operating the SymmetraTM Powering the Power Array IntroductionVoltage Status Screen Powering the LoadsReview Status Conditions Load With No Redundancy Status ScreenFrequency Status Screen Load With Redundancy Status Screen Battery Status ScreenPower Status Screen Perform a Self Test Alarm Threshold Status Screen11 Sample Alarm Threshold Status Screen Miscellaneous Status ScreenSwitching Audible Alarm Beeper Off Configure AlarmsAlarm Thresholds Selection Screen Shutdown Parameter Selection ScreenReview Logging Menu Review Diagnostic InformationDiagnostics Menu Screen Event Log ScreenModule Replacement Returning Modules to APC Module ReplacementModule Failure Alarm Indicators Replacement Battery Module Verification Battery Module ReplacementInstalling the Replacement Module Refer to for the power module installation proce- dure Power Module ReplacementReplacement Module Verification Replacement MIM Verification Redundant Intelligence Module ReplacementInstalling the Replacement Main Intelligence Module Installing the Replacement Redundant Intelligence ModulePowerView Interface Messages RIM is awake PowerView Meaning Corrective Action Message Start-UpMIM detects the RIM before Load is No Longer above PowerView Meaning Corrective Action Message# of batteries decreased Has been corrected either becauseSelect zero Setup-Alarms-RedundancyThreshold. Startup-Setup-Alarms Redundancy-selectBattery modules are being Because of a power failure, wait forSupport. See inside front cover PowerView Display Messages Index Description Configuring PowerView Threshold statusElectro-static discharge, 2-1 Emergency power off Checklist Input Output Overview Repo ConfiguringDescription, 1-4 Installation Ordering information Frame, 2-1 ModulesReplacement Modules & Accessories English Text