Table of Contents
INTRODUCTION
Theory of Operation | i |
Modes of Operation | iii |
SAFETY INFORMATION
Symbols Used In This Manual | |
Important Safety Instructions |
1. PHYSICAL REPRESENTATION
The Power Array Frame | |
PowerView User Interface | |
Grill Covers | |
Power Module | |
Battery Module | |
Main Intelligence Module (MIM) | |
Redundant Intelligence Module (RIM) | |
Input Circuit Breaker | |
Maintenance Bypass Switch | |
Rear View of Power Array | |
System Enable Switch | |
Communication Interface Ports | |
SmartSlotTM Accessory Ports | |
REPO/Input/Output Wiring Panels | |
Convenience Power Panel | |
Extended Run Battery Frame Connector |
2. SITE PREPARATION
Space and Weight Considerations | |
Transporting Power Array to Installation Site | |
Operating Conditions | |
BTU Output |
3. UNPACKING AND INSTALLING FRAME
Initial Inspection | |
Check For Damage | |
Handling Considerations | |
Move the Frame | |
Remove Packing Materials | |
Remove the Frame from the Pallet | |
Moving Battery & Power Modules |
4. WIRING REQUIRMENTS & PROCEDURES
Wiring Overview | |
Input Wiring | |
Output Wiring | |
Remote Emergency Power Off Wiring | |
Electrical Wiring Test/Checklist |