American Power Conversion
PX
user manual
Specs
Install
Alarm Threshold Status Screen
Symbols Used In This Manual
PowerView LED Indicators
SymmetraTM Wiring
Warranty
Dimension
Maintenance
Configure Alarms
Page 13
vi
Page 12
Page 14
Image 13
Page 12
Page 14
Contents
Page
+353 91
Main Tech Support
Toll-Free Numbers
0660
Radio Frequency Interference
Important Safety Instructions
Life Support Policy
Limited Warranty
Table of Contents
Index
MiniFrame MasterFrame
Introduction
Fig I-2 Functional Diagram of a SymmetraTM
Power Processing Battery Source
Thank You SymmetraTM Overview
Theory of Operation
Battery Source
Power Processing System
Control/User Interface
On-Line Operating Mode
Load-Disconnect Mode
Modes of Operation
Bypass Operating Mode
On-Battery Operating Mode
Important Information
Definitions
Page
Important Safety Information
Safety Information
Safety Earth Ground Indicates the pri- mary safety ground
Symbols Used In This Manual
Safety-2
Physical Representation
Five Four Power Battery
Power Array Frame
Module
Bays
Power Module
Powerview User Interface
Battery Module
Power Module
Main Intelligence Module MIM
Maintenance Bypass Switch
Redundant Intelligence Module RIM
Input Circuit Breaker
Rear View of a Power Array
Site Preparation
Transporting Power Array to Installation Site
Space and Weight Considerations
Operating Conditions
BTU Output
Site Preparation
Unpacking and Installing Frame
Initial Inspection
Dimensions Weight
Move the Frame
Check For Damage
Remove Packing Materials
Moving Battery & Power Modules
Remove the Frame from the Pallet
Wiring Requirements & Procedures
Input Wiring
SymmetraTM Wiring
Output Wiring
Repo Switch Wiring
Input Wiring Specifications
Input Wiring
Input Wiring Procedures
Ground Wiring and Input Wiring Terminal Blocks
Ground Wiring Terminal Block
Output Wiring Installation
Output Wiring
Repo Specifications
Remote Emergency Power Off Switch
Repo Switch Installation
Cable Specifications
Electrical Wiring Test/Checklist
Electrical Wiring Test
Contact Closure Repo Switch Connection
Vdc Repo Switch Connection
11 Startup Screen
Record the PowerView reported
Setting Up The Power Array
Frame Leveling Procedure
Setup of Power Array
Removing Grill Covers
Positions
Procedure for Battery Module Installation
Installing the Battery Modules
Clear all battery module bays of any debris
Battery Module Location of Battery Module Bays
Procedure for Power Module Installation
Installing the Power Modules
Installing the Redundant Intelligence Module RIM
Installing the Main Intelligence Module MIM
Main Intelligence Module
10 Location of the MIM and RIM
Remote Placement of the PowerView
Installing the PowerView Interface
Wall Mounting the PowerView
Remove the grill cover from the top level of the frame
SmartSlotTM Interface Accessories
Installation Test/Checklist
Installation Test
SymmetraTM Power Module/Frame Capacities
Power Reported
21 Miscellaneous Status Screen 22 Power The Load Sequence
25 Return to On-Line Mode
System Setup
PowerView Display
PowerView Functions
Physical Features of the Powerview
PowerView Interface
Symbol Name Function of Key On Key
PowerView LED Indicators
Esc
Navigation Keys
Top-Level Menu Screen
Startup Screen
Control
Status
Accessories
Setup
Diagnostics
Logging
Configuring & Operating the SymmetraTM
Introduction
Powering the Power Array
Review Status Conditions
Powering the Loads
Voltage Status Screen
Load With No Redundancy Status Screen
Power Status Screen
Load With Redundancy Status Screen Battery Status Screen
Frequency Status Screen
11 Sample Alarm Threshold Status Screen
Alarm Threshold Status Screen
Perform a Self Test
Miscellaneous Status Screen
Alarm Thresholds Selection Screen
Configure Alarms
Switching Audible Alarm Beeper Off
Shutdown Parameter Selection Screen
Diagnostics Menu Screen
Review Diagnostic Information
Review Logging Menu
Event Log Screen
Module Replacement
Module Failure Alarm Indicators
Module Replacement
Returning Modules to APC
Installing the Replacement Module
Battery Module Replacement
Replacement Battery Module Verification
Replacement Module Verification
Power Module Replacement
Refer to for the power module installation proce- dure
Installing the Replacement Main Intelligence Module
Redundant Intelligence Module Replacement
Replacement MIM Verification
Installing the Replacement Redundant Intelligence Module
PowerView Interface Messages
MIM detects the RIM before
PowerView Meaning Corrective Action Message Start-Up
RIM is awake
# of batteries decreased
PowerView Meaning Corrective Action Message
Load is No Longer above
Has been corrected either because
Threshold. Startup-Setup-Alarms
Setup-Alarms-Redundancy
Select zero
Redundancy-select
Because of a power failure, wait for
Battery modules are being
Support. See inside front cover
PowerView Display Messages
Index
Electro-static discharge, 2-1 Emergency power off
Configuring PowerView Threshold status
Description
Description, 1-4 Installation Ordering information
Configuring
Checklist Input Output Overview Repo
Frame, 2-1 Modules
Replacement Modules & Accessories
English Text
Related pages
Troubleshooting for Dell 946
Specifications for Bakers Pride Oven EB-1-2828
To resolve the error message for Kodak 4700
Servicing Instructions Fault Finding Charts for Stovax PR0741
When Headset is connected Pause playback or select for Samsung GT-I5800L Series
Réinstallation for KitchenAid KDRS807
Parts List for Stanley Black & Decker CO25
International Telex/Telephone Country Code List for Furuno RC-1500-1T
Are there any common issues with Tektronix 11402?
Check issues
Top
Page
Image
Contents