American Power Conversion PX Installing the PowerView Interface, Wall Mounting the PowerView

Page 41

Chapter 5 - System Setup

Installing the PowerView Interface

A 61.5 cm (24") RJ45 cable is provided in the intelligence modules bay. It is used to connect the PowerView to the Power Array. Use the following procedure to install the PowerView interface onto the frame:

1.Remove the grill cover from the top level of the frame.

2.Feed the end of the RJ45 cable through the center slot of the grill cover. Replace the grill cover. See figure 5-11.

Fig 5-11 PowerView Cable Through The Top Grill Cover

3.Connect the RJ45 plug into the receptacle on the back of the PowerView as shown in figure 5-12.

Fig 5-12 Attach the Cable to the PowerView

5.Position the PowerView over the mounting post on the front of the frame, and push straight down. The PowerView snaps into place. See figure 5-13.

6.Tuck the excess cable into the grill cover.

Fig 5-13 Install PowerView On The Frame

Remote Placement of the PowerView

Follow these steps to install the PowerView user interface in a remote location:

Note: A 6.1m (20') Remote RJ45 cable is included with the SymmetraTM Power Array.

1.Connect the Remote RJ45 cable to the communication port at the rear of the Power Array frame. See figure 1-10.

2.Connect the other end of the cable to the receptacle at the rear of the PowerView. See figure 5-12.

Note: The short length of RJ45 cable that is hardwired to the Power Array frame can be safely coiled and placed on top of the redundant intelligence module.

3.Replace the grill cover.

The PowerView can sit upright on a flat surface by folding out the wire bail on the back. It can also be mounted onto a wall.

Wall Mounting the PowerView

Follow these steps to install the PowerView on a wall:

1.Note the four mounting slots molded into the back of the PowerView interface.

2.Use the template in figure 5-14 to secure four large screws on a clean dry wall surface.

3.Leave the head of each screw 8mm (5/16") out from the surface of the wall. Screws must be strong enough to sup- port 6.8kg (15lb).

4.Mount the PowerView display onto the wall by position- ing it over the screws and sliding it down until it is securely in place.

5-5

Image 41
Contents Page +353 91 Main Tech SupportToll-Free Numbers 0660Radio Frequency Interference Important Safety InstructionsLife Support Policy Limited WarrantyTable of Contents Index MiniFrame MasterFrame IntroductionFig I-2 Functional Diagram of a SymmetraTM Power Processing Battery SourceThank You SymmetraTM Overview Theory of OperationControl/User Interface Power Processing SystemBattery Source Modes of Operation Load-Disconnect ModeOn-Line Operating Mode Bypass Operating Mode On-Battery Operating ModeImportant Information DefinitionsPage Important Safety Information Safety InformationSafety Earth Ground Indicates the pri- mary safety ground Symbols Used In This ManualSafety-2 Physical Representation Five Four Power Battery Power Array FrameModule BaysPower Module Powerview User InterfaceBattery Module Power ModuleMain Intelligence Module MIM Maintenance Bypass SwitchRedundant Intelligence Module RIM Input Circuit BreakerRear View of a Power Array Site Preparation Transporting Power Array to Installation Site Space and Weight ConsiderationsOperating Conditions BTU OutputSite Preparation Unpacking and Installing Frame Initial Inspection Dimensions WeightMove the Frame Check For DamageRemove the Frame from the Pallet Moving Battery & Power ModulesRemove Packing Materials Wiring Requirements & Procedures Input Wiring SymmetraTM WiringOutput Wiring Repo Switch WiringInput Wiring Procedures Input WiringInput Wiring Specifications Ground Wiring and Input Wiring Terminal Blocks Ground Wiring Terminal BlockOutput Wiring Installation Output WiringRepo Specifications Remote Emergency Power Off SwitchRepo Switch Installation Cable SpecificationsElectrical Wiring Test/Checklist Electrical Wiring TestContact Closure Repo Switch Connection Vdc Repo Switch Connection11 Startup Screen Record the PowerView reportedSetting Up The Power Array Frame Leveling Procedure Setup of Power ArrayRemoving Grill Covers PositionsProcedure for Battery Module Installation Installing the Battery ModulesClear all battery module bays of any debris Battery Module Location of Battery Module BaysProcedure for Power Module Installation Installing the Power ModulesInstalling the Redundant Intelligence Module RIM Installing the Main Intelligence Module MIMMain Intelligence Module 10 Location of the MIM and RIMRemote Placement of the PowerView Installing the PowerView InterfaceWall Mounting the PowerView Remove the grill cover from the top level of the frameSmartSlotTM Interface Accessories Installation Test/Checklist Installation Test21 Miscellaneous Status Screen 22 Power The Load Sequence Power ReportedSymmetraTM Power Module/Frame Capacities 25 Return to On-Line Mode System Setup PowerView Display PowerView Interface Physical Features of the PowerviewPowerView Functions Symbol Name Function of Key On Key PowerView LED IndicatorsEsc Navigation KeysTop-Level Menu Screen Startup ScreenControl StatusAccessories SetupDiagnostics LoggingConfiguring & Operating the SymmetraTM Introduction Powering the Power ArrayReview Status Conditions Powering the LoadsVoltage Status Screen Load With No Redundancy Status ScreenFrequency Status Screen Load With Redundancy Status Screen Battery Status ScreenPower Status Screen 11 Sample Alarm Threshold Status Screen Alarm Threshold Status ScreenPerform a Self Test Miscellaneous Status ScreenAlarm Thresholds Selection Screen Configure AlarmsSwitching Audible Alarm Beeper Off Shutdown Parameter Selection ScreenDiagnostics Menu Screen Review Diagnostic InformationReview Logging Menu Event Log ScreenModule Replacement Returning Modules to APC Module ReplacementModule Failure Alarm Indicators Replacement Battery Module Verification Battery Module ReplacementInstalling the Replacement Module Refer to for the power module installation proce- dure Power Module ReplacementReplacement Module Verification Installing the Replacement Main Intelligence Module Redundant Intelligence Module ReplacementReplacement MIM Verification Installing the Replacement Redundant Intelligence ModulePowerView Interface Messages RIM is awake PowerView Meaning Corrective Action Message Start-UpMIM detects the RIM before # of batteries decreased PowerView Meaning Corrective Action MessageLoad is No Longer above Has been corrected either becauseThreshold. Startup-Setup-Alarms Setup-Alarms-RedundancySelect zero Redundancy-selectBecause of a power failure, wait for Battery modules are beingSupport. See inside front cover PowerView Display Messages Index Description Configuring PowerView Threshold statusElectro-static discharge, 2-1 Emergency power off Description, 1-4 Installation Ordering information ConfiguringChecklist Input Output Overview Repo Frame, 2-1 ModulesReplacement Modules & Accessories English Text