q10. Place the SymmetraTM into Bypass mode by follow- ing the screen sequence in figure 5-24.

Fig 5-24 Initiate Bypass Mode

The Bypass LED indicator should glow, and the PowerView display will indicate that the “UPS (SymmetraTM) IS BY- PASSED.”

q11. Return the SymmetraTM to the On-Line mode of op- eration by following the screen sequence in figure 5-25.

Fig 5-25 Return to On-Line Mode

The Bypass LED indicator should cease to glow, and the mes- sage“UPS IS OUT OF BYPASS”will appear on the PowerView display. Press any key to return to the startup screen.

q12. Power down the load equipment by following the screen sequence in figure 5-26.

Fig 5-26 Power Down the Load Sequence

From the Control menu, power down the load equipment by executing the “UPS LOAD OFF”command. After several sec- onds, the “UPS LOAD IS OFF”message is displayed. All LED indicators on the PowerView should be off.

q13. Power down the SymmetraTM by switching the sys- tem enable switch and the input circuit breaker to the “stand by” position. The installation procedure has now been com- pleted.

Note: This procedure is an installation checklist. Read and follow the steps in Chapter 7 to configure the SymmetraTM Power Array for your specific power needs.

5-9

Image 45
Contents Page +353 91 Main Tech SupportToll-Free Numbers 0660Radio Frequency Interference Important Safety InstructionsLife Support Policy Limited WarrantyTable of Contents Index MiniFrame MasterFrame IntroductionFig I-2 Functional Diagram of a SymmetraTM Power Processing Battery SourceThank You SymmetraTM Overview Theory of OperationPower Processing System Battery SourceControl/User Interface Load-Disconnect Mode On-Line Operating ModeModes of Operation Bypass Operating Mode On-Battery Operating ModeImportant Information DefinitionsPage Important Safety Information Safety InformationSafety Earth Ground Indicates the pri- mary safety ground Symbols Used In This ManualSafety-2 Physical Representation Five Four Power Battery Power Array FrameModule BaysPower Module Powerview User InterfaceBattery Module Power ModuleMain Intelligence Module MIM Maintenance Bypass SwitchRedundant Intelligence Module RIM Input Circuit BreakerRear View of a Power Array Site Preparation Transporting Power Array to Installation Site Space and Weight ConsiderationsOperating Conditions BTU OutputSite Preparation Unpacking and Installing Frame Initial Inspection Dimensions WeightMove the Frame Check For DamageMoving Battery & Power Modules Remove Packing MaterialsRemove the Frame from the Pallet Wiring Requirements & Procedures Input Wiring SymmetraTM WiringOutput Wiring Repo Switch WiringInput Wiring Input Wiring SpecificationsInput Wiring Procedures Ground Wiring and Input Wiring Terminal Blocks Ground Wiring Terminal BlockOutput Wiring Installation Output WiringRepo Specifications Remote Emergency Power Off SwitchRepo Switch Installation Cable SpecificationsElectrical Wiring Test/Checklist Electrical Wiring TestContact Closure Repo Switch Connection Vdc Repo Switch Connection11 Startup Screen Record the PowerView reportedSetting Up The Power Array Frame Leveling Procedure Setup of Power ArrayRemoving Grill Covers PositionsProcedure for Battery Module Installation Installing the Battery ModulesClear all battery module bays of any debris Battery Module Location of Battery Module BaysProcedure for Power Module Installation Installing the Power ModulesInstalling the Redundant Intelligence Module RIM Installing the Main Intelligence Module MIMMain Intelligence Module 10 Location of the MIM and RIMRemote Placement of the PowerView Installing the PowerView InterfaceWall Mounting the PowerView Remove the grill cover from the top level of the frameSmartSlotTM Interface Accessories Installation Test/Checklist Installation TestPower Reported SymmetraTM Power Module/Frame Capacities21 Miscellaneous Status Screen 22 Power The Load Sequence 25 Return to On-Line Mode System Setup PowerView Display Physical Features of the Powerview PowerView FunctionsPowerView Interface Symbol Name Function of Key On Key PowerView LED IndicatorsEsc Navigation KeysTop-Level Menu Screen Startup ScreenControl StatusAccessories SetupDiagnostics LoggingConfiguring & Operating the SymmetraTM Introduction Powering the Power ArrayReview Status Conditions Powering the LoadsVoltage Status Screen Load With No Redundancy Status ScreenLoad With Redundancy Status Screen Battery Status Screen Power Status ScreenFrequency Status Screen 11 Sample Alarm Threshold Status Screen Alarm Threshold Status ScreenPerform a Self Test Miscellaneous Status ScreenAlarm Thresholds Selection Screen Configure AlarmsSwitching Audible Alarm Beeper Off Shutdown Parameter Selection ScreenDiagnostics Menu Screen Review Diagnostic InformationReview Logging Menu Event Log ScreenModule Replacement Module Replacement Module Failure Alarm IndicatorsReturning Modules to APC Battery Module Replacement Installing the Replacement ModuleReplacement Battery Module Verification Power Module Replacement Replacement Module VerificationRefer to for the power module installation proce- dure Installing the Replacement Main Intelligence Module Redundant Intelligence Module ReplacementReplacement MIM Verification Installing the Replacement Redundant Intelligence ModulePowerView Interface Messages PowerView Meaning Corrective Action Message Start-Up MIM detects the RIM beforeRIM is awake # of batteries decreased PowerView Meaning Corrective Action MessageLoad is No Longer above Has been corrected either becauseThreshold. Startup-Setup-Alarms Setup-Alarms-RedundancySelect zero Redundancy-selectBecause of a power failure, wait for Battery modules are beingSupport. See inside front cover PowerView Display Messages Index Configuring PowerView Threshold status Electro-static discharge, 2-1 Emergency power offDescription Description, 1-4 Installation Ordering information ConfiguringChecklist Input Output Overview Repo Frame, 2-1 ModulesReplacement Modules & Accessories English Text