American Power Conversion PX user manual Setting Up The Power Array, MiniFrame MasterFrame

Page 36

Chapter Five

Setting Up The Power Array

This chapter provides the procedures for leveling the frame, installing the battery and power modules, and connecting the PowerView. An installation test is provided at the end of this chapter. Follow these steps to ensure that the system is properly installed and ready to supply conditioned power to load equipment.

MiniFrame

MasterFrame

Image 36
Contents Page Main Tech Support +353 91Toll-Free Numbers 0660Important Safety Instructions Radio Frequency InterferenceLimited Warranty Life Support PolicyTable of Contents Index Introduction MiniFrame MasterFramePower Processing Battery Source Fig I-2 Functional Diagram of a SymmetraTMThank You SymmetraTM Overview Theory of OperationPower Processing System Battery SourceControl/User Interface Load-Disconnect Mode On-Line Operating ModeModes of Operation On-Battery Operating Mode Bypass Operating ModeDefinitions Important InformationPage Safety Information Important Safety InformationSymbols Used In This Manual Safety Earth Ground Indicates the pri- mary safety groundSafety-2 Physical Representation Power Array Frame Five Four Power BatteryModule BaysPowerview User Interface Power ModuleBattery Module Power ModuleMaintenance Bypass Switch Main Intelligence Module MIMRedundant Intelligence Module RIM Input Circuit BreakerRear View of a Power Array Site Preparation Space and Weight Considerations Transporting Power Array to Installation SiteOperating Conditions BTU OutputSite Preparation Unpacking and Installing Frame Dimensions Weight Initial InspectionMove the Frame Check For DamageMoving Battery & Power Modules Remove Packing MaterialsRemove the Frame from the Pallet Wiring Requirements & Procedures SymmetraTM Wiring Input WiringOutput Wiring Repo Switch WiringInput Wiring Input Wiring SpecificationsInput Wiring Procedures Ground Wiring Terminal Block Ground Wiring and Input Wiring Terminal BlocksOutput Wiring Output Wiring InstallationRemote Emergency Power Off Switch Repo SpecificationsRepo Switch Installation Cable SpecificationsElectrical Wiring Test Electrical Wiring Test/ChecklistContact Closure Repo Switch Connection Vdc Repo Switch ConnectionRecord the PowerView reported 11 Startup ScreenSetting Up The Power Array Setup of Power Array Frame Leveling ProcedureRemoving Grill Covers PositionsInstalling the Battery Modules Procedure for Battery Module InstallationClear all battery module bays of any debris Battery Module Location of Battery Module BaysInstalling the Power Modules Procedure for Power Module InstallationInstalling the Main Intelligence Module MIM Installing the Redundant Intelligence Module RIMMain Intelligence Module 10 Location of the MIM and RIMInstalling the PowerView Interface Remote Placement of the PowerViewWall Mounting the PowerView Remove the grill cover from the top level of the frameSmartSlotTM Interface Accessories Installation Test Installation Test/ChecklistPower Reported SymmetraTM Power Module/Frame Capacities21 Miscellaneous Status Screen 22 Power The Load Sequence 25 Return to On-Line Mode System Setup PowerView Display Physical Features of the Powerview PowerView FunctionsPowerView Interface PowerView LED Indicators Symbol Name Function of Key On KeyEsc Navigation KeysStartup Screen Top-Level Menu ScreenControl StatusSetup AccessoriesDiagnostics LoggingConfiguring & Operating the SymmetraTM Powering the Power Array IntroductionPowering the Loads Review Status ConditionsVoltage Status Screen Load With No Redundancy Status ScreenLoad With Redundancy Status Screen Battery Status Screen Power Status ScreenFrequency Status Screen Alarm Threshold Status Screen 11 Sample Alarm Threshold Status ScreenPerform a Self Test Miscellaneous Status ScreenConfigure Alarms Alarm Thresholds Selection ScreenSwitching Audible Alarm Beeper Off Shutdown Parameter Selection ScreenReview Diagnostic Information Diagnostics Menu ScreenReview Logging Menu Event Log ScreenModule Replacement Module Replacement Module Failure Alarm IndicatorsReturning Modules to APC Battery Module Replacement Installing the Replacement ModuleReplacement Battery Module Verification Power Module Replacement Replacement Module VerificationRefer to for the power module installation proce- dure Redundant Intelligence Module Replacement Installing the Replacement Main Intelligence ModuleReplacement MIM Verification Installing the Replacement Redundant Intelligence ModulePowerView Interface Messages PowerView Meaning Corrective Action Message Start-Up MIM detects the RIM beforeRIM is awake PowerView Meaning Corrective Action Message # of batteries decreasedLoad is No Longer above Has been corrected either becauseSetup-Alarms-Redundancy Threshold. Startup-Setup-AlarmsSelect zero Redundancy-selectBattery modules are being Because of a power failure, wait forSupport. See inside front cover PowerView Display Messages Index Configuring PowerView Threshold status Electro-static discharge, 2-1 Emergency power offDescription Configuring Description, 1-4 Installation Ordering informationChecklist Input Output Overview Repo Frame, 2-1 ModulesReplacement Modules & Accessories English Text