American Power Conversion
PX
user manual
Index, MiniFrame MasterFrame
Specifications
Install
Alarm Threshold Status Screen
Symbols Used In This Manual
PowerView LED Indicators
SymmetraTM Wiring
Warranty
Dimension
Maintenance
Configure Alarms
Page 71
Index
A comprehensive index of all terms and concepts
MiniFrame
MasterFrame
Page 70
Page 72
Image 71
Page 70
Page 72
Contents
Page
0660
Main Tech Support
+353 91
Toll-Free Numbers
Radio Frequency Interference
Important Safety Instructions
Life Support Policy
Limited Warranty
Table of Contents
Index
MiniFrame MasterFrame
Introduction
Theory of Operation
Power Processing Battery Source
Fig I-2 Functional Diagram of a SymmetraTM
Thank You SymmetraTM Overview
Control/User Interface
Power Processing System
Battery Source
Modes of Operation
Load-Disconnect Mode
On-Line Operating Mode
Bypass Operating Mode
On-Battery Operating Mode
Important Information
Definitions
Page
Important Safety Information
Safety Information
Safety Earth Ground Indicates the pri- mary safety ground
Symbols Used In This Manual
Safety-2
Physical Representation
Bays
Power Array Frame
Five Four Power Battery
Module
Power Module
Powerview User Interface
Power Module
Battery Module
Input Circuit Breaker
Maintenance Bypass Switch
Main Intelligence Module MIM
Redundant Intelligence Module RIM
Rear View of a Power Array
Site Preparation
BTU Output
Space and Weight Considerations
Transporting Power Array to Installation Site
Operating Conditions
Site Preparation
Unpacking and Installing Frame
Check For Damage
Dimensions Weight
Initial Inspection
Move the Frame
Remove the Frame from the Pallet
Moving Battery & Power Modules
Remove Packing Materials
Wiring Requirements & Procedures
Repo Switch Wiring
SymmetraTM Wiring
Input Wiring
Output Wiring
Input Wiring Procedures
Input Wiring
Input Wiring Specifications
Ground Wiring and Input Wiring Terminal Blocks
Ground Wiring Terminal Block
Output Wiring Installation
Output Wiring
Cable Specifications
Remote Emergency Power Off Switch
Repo Specifications
Repo Switch Installation
Vdc Repo Switch Connection
Electrical Wiring Test
Electrical Wiring Test/Checklist
Contact Closure Repo Switch Connection
11 Startup Screen
Record the PowerView reported
Setting Up The Power Array
Positions
Setup of Power Array
Frame Leveling Procedure
Removing Grill Covers
Battery Module Location of Battery Module Bays
Installing the Battery Modules
Procedure for Battery Module Installation
Clear all battery module bays of any debris
Procedure for Power Module Installation
Installing the Power Modules
10 Location of the MIM and RIM
Installing the Main Intelligence Module MIM
Installing the Redundant Intelligence Module RIM
Main Intelligence Module
Remove the grill cover from the top level of the frame
Installing the PowerView Interface
Remote Placement of the PowerView
Wall Mounting the PowerView
SmartSlotTM Interface Accessories
Installation Test/Checklist
Installation Test
21 Miscellaneous Status Screen 22 Power The Load Sequence
Power Reported
SymmetraTM Power Module/Frame Capacities
25 Return to On-Line Mode
System Setup
PowerView Display
PowerView Interface
Physical Features of the Powerview
PowerView Functions
Navigation Keys
PowerView LED Indicators
Symbol Name Function of Key On Key
Esc
Status
Startup Screen
Top-Level Menu Screen
Control
Logging
Setup
Accessories
Diagnostics
Configuring & Operating the SymmetraTM
Introduction
Powering the Power Array
Load With No Redundancy Status Screen
Powering the Loads
Review Status Conditions
Voltage Status Screen
Frequency Status Screen
Load With Redundancy Status Screen Battery Status Screen
Power Status Screen
Miscellaneous Status Screen
Alarm Threshold Status Screen
11 Sample Alarm Threshold Status Screen
Perform a Self Test
Shutdown Parameter Selection Screen
Configure Alarms
Alarm Thresholds Selection Screen
Switching Audible Alarm Beeper Off
Event Log Screen
Review Diagnostic Information
Diagnostics Menu Screen
Review Logging Menu
Module Replacement
Returning Modules to APC
Module Replacement
Module Failure Alarm Indicators
Replacement Battery Module Verification
Battery Module Replacement
Installing the Replacement Module
Refer to for the power module installation proce- dure
Power Module Replacement
Replacement Module Verification
Installing the Replacement Redundant Intelligence Module
Redundant Intelligence Module Replacement
Installing the Replacement Main Intelligence Module
Replacement MIM Verification
PowerView Interface Messages
RIM is awake
PowerView Meaning Corrective Action Message Start-Up
MIM detects the RIM before
Has been corrected either because
PowerView Meaning Corrective Action Message
# of batteries decreased
Load is No Longer above
Redundancy-select
Setup-Alarms-Redundancy
Threshold. Startup-Setup-Alarms
Select zero
Because of a power failure, wait for
Battery modules are being
Support. See inside front cover
PowerView Display Messages
Index
Description
Configuring PowerView Threshold status
Electro-static discharge, 2-1 Emergency power off
Frame, 2-1 Modules
Configuring
Description, 1-4 Installation Ordering information
Checklist Input Output Overview Repo
Replacement Modules & Accessories
English Text
Related pages
Troubleshooting for ACDelco AC-G0005
Specifications for Samsung EC-D330ZSBA/E1
Conversion Service failure produces no error message for IBM G325-2585-02
HP Compaq dc5850 Business PC Architecture, Block diagram for HP dc5850
When the appliance is not in use for Zanussi ZI 9310 DIS
About installing VCS on a single node for Symantec 5
Parts LIST, Liste DES PIÈCES, Lista DE Piezas for Weber 89563
Language code list for Panasonic DVD-RA61
What should I do if my RT35K5500S9 isn't cooling properly?
Find solutions
Top
Page
Image
Contents