American Power Conversion PX user manual Startup Screen, Record the PowerView reported

Page 35

Chapter 4 - Electrical Requirements and Procedures

q6. Using the PowerView display, read and record the re- ported input voltage from the startup screen. (“220Vin” in figure 4-11 indicates that the input voltage is 220V.) Note: The PowerView may display one or more messages such as “Number of Battery Modules Changed.” Press the ESC key until the startup screen appears.

Record the PowerView reported

input voltage here: ______________________________

Fig 4-11 Startup Screen

q7. Compare the RMS input voltage measurement (Step #2) with the input voltage as reported by the PowerView. If the two measurements are significantly different, con- tact APC SymmetraTM technical support.

q8. Switch the maintenance bypass switch to the “on” po- sition. The Power Array will go into the manual bypass mode, and voltage should now be present at the output terminal connections. The bypass LED on the PowerView display will glow and one or more messages may appear on the PowerView display. Ignore these mes- sages by pressing the ESC navigation key on the PowerView display until the startup screen reappears. See figure 4-11. Read and record the output voltage that is indicated on the PowerView. (“000Vout” in figure 4-11 indicates that the output voltage is 000V.)

Note: The reported output voltage should be approximately 220V, 230V, or 240V, depending on how the system is con- figured.

Record the PowerView reported

output voltage here: _____________________________

q9. Measure the output AC voltage at the output wiring terminal block. If the measured output voltage varies significantly from the actual input voltage, or from the output voltage reported by the PowerView, contact SymmetraTM technical support.

q10. Successful completion of steps 1 through 9 indicates the Power Array is correctly wired to the utility power source and that the correct output voltage is available at the output terminal block. Load equipment voltage re- quirements and external wiring voltages should be checked and verified at this time.

q11. Shut down the Power Array by switching the input circuit breaker and the system enable switch to the “off” position. Replace all wiring access panels on the Power Array frame. The electrical connections have now been properly installed and checked. The Power Array is now ready for the setup procedure in Chapter 5.

4-7

Image 35
Contents Page 0660 Main Tech Support+353 91 Toll-Free NumbersRadio Frequency Interference Important Safety InstructionsLife Support Policy Limited WarrantyTable of Contents Index MiniFrame MasterFrame IntroductionTheory of Operation Power Processing Battery SourceFig I-2 Functional Diagram of a SymmetraTM Thank You SymmetraTM OverviewControl/User Interface Power Processing SystemBattery Source Modes of Operation Load-Disconnect ModeOn-Line Operating Mode Bypass Operating Mode On-Battery Operating ModeImportant Information DefinitionsPage Important Safety Information Safety InformationSafety Earth Ground Indicates the pri- mary safety ground Symbols Used In This ManualSafety-2 Physical Representation Bays Power Array FrameFive Four Power Battery ModulePower Module Powerview User InterfacePower Module Battery ModuleInput Circuit Breaker Maintenance Bypass SwitchMain Intelligence Module MIM Redundant Intelligence Module RIMRear View of a Power Array Site Preparation BTU Output Space and Weight ConsiderationsTransporting Power Array to Installation Site Operating ConditionsSite Preparation Unpacking and Installing Frame Check For Damage Dimensions WeightInitial Inspection Move the FrameRemove the Frame from the Pallet Moving Battery & Power ModulesRemove Packing Materials Wiring Requirements & Procedures Repo Switch Wiring SymmetraTM WiringInput Wiring Output WiringInput Wiring Procedures Input WiringInput Wiring Specifications Ground Wiring and Input Wiring Terminal Blocks Ground Wiring Terminal BlockOutput Wiring Installation Output WiringCable Specifications Remote Emergency Power Off SwitchRepo Specifications Repo Switch InstallationVdc Repo Switch Connection Electrical Wiring TestElectrical Wiring Test/Checklist Contact Closure Repo Switch Connection11 Startup Screen Record the PowerView reportedSetting Up The Power Array Positions Setup of Power ArrayFrame Leveling Procedure Removing Grill CoversBattery Module Location of Battery Module Bays Installing the Battery ModulesProcedure for Battery Module Installation Clear all battery module bays of any debrisProcedure for Power Module Installation Installing the Power Modules10 Location of the MIM and RIM Installing the Main Intelligence Module MIMInstalling the Redundant Intelligence Module RIM Main Intelligence ModuleRemove the grill cover from the top level of the frame Installing the PowerView InterfaceRemote Placement of the PowerView Wall Mounting the PowerViewSmartSlotTM Interface Accessories Installation Test/Checklist Installation Test21 Miscellaneous Status Screen 22 Power The Load Sequence Power ReportedSymmetraTM Power Module/Frame Capacities 25 Return to On-Line Mode System Setup PowerView Display PowerView Interface Physical Features of the PowerviewPowerView Functions Navigation Keys PowerView LED IndicatorsSymbol Name Function of Key On Key EscStatus Startup ScreenTop-Level Menu Screen ControlLogging SetupAccessories DiagnosticsConfiguring & Operating the SymmetraTM Introduction Powering the Power ArrayLoad With No Redundancy Status Screen Powering the LoadsReview Status Conditions Voltage Status ScreenFrequency Status Screen Load With Redundancy Status Screen Battery Status ScreenPower Status Screen Miscellaneous Status Screen Alarm Threshold Status Screen11 Sample Alarm Threshold Status Screen Perform a Self TestShutdown Parameter Selection Screen Configure AlarmsAlarm Thresholds Selection Screen Switching Audible Alarm Beeper OffEvent Log Screen Review Diagnostic InformationDiagnostics Menu Screen Review Logging MenuModule Replacement Returning Modules to APC Module ReplacementModule Failure Alarm Indicators Replacement Battery Module Verification Battery Module ReplacementInstalling the Replacement Module Refer to for the power module installation proce- dure Power Module ReplacementReplacement Module Verification Installing the Replacement Redundant Intelligence Module Redundant Intelligence Module ReplacementInstalling the Replacement Main Intelligence Module Replacement MIM VerificationPowerView Interface Messages RIM is awake PowerView Meaning Corrective Action Message Start-UpMIM detects the RIM before Has been corrected either because PowerView Meaning Corrective Action Message# of batteries decreased Load is No Longer aboveRedundancy-select Setup-Alarms-RedundancyThreshold. Startup-Setup-Alarms Select zeroBecause of a power failure, wait for Battery modules are beingSupport. See inside front cover PowerView Display Messages Index Description Configuring PowerView Threshold statusElectro-static discharge, 2-1 Emergency power off Frame, 2-1 Modules ConfiguringDescription, 1-4 Installation Ordering information Checklist Input Output Overview RepoReplacement Modules & Accessories English Text