American Power Conversion
PX
user manual
PowerView Display Messages
Specs
Install
Alarm Threshold Status Screen
Symbols Used In This Manual
PowerView LED Indicators
SymmetraTM Wiring
Warranty
Dimension
Maintenance
Configure Alarms
Page 70
Chapter 9 - PowerView Display Messages
9-6
Page 69
Page 71
Image 70
Page 69
Page 71
Contents
Page
Toll-Free Numbers
Main Tech Support
+353 91
0660
Important Safety Instructions
Radio Frequency Interference
Limited Warranty
Life Support Policy
Table of Contents
Index
Introduction
MiniFrame MasterFrame
Thank You SymmetraTM Overview
Power Processing Battery Source
Fig I-2 Functional Diagram of a SymmetraTM
Theory of Operation
Battery Source
Power Processing System
Control/User Interface
On-Line Operating Mode
Load-Disconnect Mode
Modes of Operation
On-Battery Operating Mode
Bypass Operating Mode
Definitions
Important Information
Page
Safety Information
Important Safety Information
Symbols Used In This Manual
Safety Earth Ground Indicates the pri- mary safety ground
Safety-2
Physical Representation
Module
Power Array Frame
Five Four Power Battery
Bays
Battery Module
Powerview User Interface
Power Module
Power Module
Redundant Intelligence Module RIM
Maintenance Bypass Switch
Main Intelligence Module MIM
Input Circuit Breaker
Rear View of a Power Array
Site Preparation
Operating Conditions
Space and Weight Considerations
Transporting Power Array to Installation Site
BTU Output
Site Preparation
Unpacking and Installing Frame
Move the Frame
Dimensions Weight
Initial Inspection
Check For Damage
Remove Packing Materials
Moving Battery & Power Modules
Remove the Frame from the Pallet
Wiring Requirements & Procedures
Output Wiring
SymmetraTM Wiring
Input Wiring
Repo Switch Wiring
Input Wiring Specifications
Input Wiring
Input Wiring Procedures
Ground Wiring Terminal Block
Ground Wiring and Input Wiring Terminal Blocks
Output Wiring
Output Wiring Installation
Repo Switch Installation
Remote Emergency Power Off Switch
Repo Specifications
Cable Specifications
Contact Closure Repo Switch Connection
Electrical Wiring Test
Electrical Wiring Test/Checklist
Vdc Repo Switch Connection
Record the PowerView reported
11 Startup Screen
Setting Up The Power Array
Removing Grill Covers
Setup of Power Array
Frame Leveling Procedure
Positions
Clear all battery module bays of any debris
Installing the Battery Modules
Procedure for Battery Module Installation
Battery Module Location of Battery Module Bays
Installing the Power Modules
Procedure for Power Module Installation
Main Intelligence Module
Installing the Main Intelligence Module MIM
Installing the Redundant Intelligence Module RIM
10 Location of the MIM and RIM
Wall Mounting the PowerView
Installing the PowerView Interface
Remote Placement of the PowerView
Remove the grill cover from the top level of the frame
SmartSlotTM Interface Accessories
Installation Test
Installation Test/Checklist
SymmetraTM Power Module/Frame Capacities
Power Reported
21 Miscellaneous Status Screen 22 Power The Load Sequence
25 Return to On-Line Mode
System Setup
PowerView Display
PowerView Functions
Physical Features of the Powerview
PowerView Interface
Esc
PowerView LED Indicators
Symbol Name Function of Key On Key
Navigation Keys
Control
Startup Screen
Top-Level Menu Screen
Status
Diagnostics
Setup
Accessories
Logging
Configuring & Operating the SymmetraTM
Powering the Power Array
Introduction
Voltage Status Screen
Powering the Loads
Review Status Conditions
Load With No Redundancy Status Screen
Power Status Screen
Load With Redundancy Status Screen Battery Status Screen
Frequency Status Screen
Perform a Self Test
Alarm Threshold Status Screen
11 Sample Alarm Threshold Status Screen
Miscellaneous Status Screen
Switching Audible Alarm Beeper Off
Configure Alarms
Alarm Thresholds Selection Screen
Shutdown Parameter Selection Screen
Review Logging Menu
Review Diagnostic Information
Diagnostics Menu Screen
Event Log Screen
Module Replacement
Module Failure Alarm Indicators
Module Replacement
Returning Modules to APC
Installing the Replacement Module
Battery Module Replacement
Replacement Battery Module Verification
Replacement Module Verification
Power Module Replacement
Refer to for the power module installation proce- dure
Replacement MIM Verification
Redundant Intelligence Module Replacement
Installing the Replacement Main Intelligence Module
Installing the Replacement Redundant Intelligence Module
PowerView Interface Messages
MIM detects the RIM before
PowerView Meaning Corrective Action Message Start-Up
RIM is awake
Load is No Longer above
PowerView Meaning Corrective Action Message
# of batteries decreased
Has been corrected either because
Select zero
Setup-Alarms-Redundancy
Threshold. Startup-Setup-Alarms
Redundancy-select
Battery modules are being
Because of a power failure, wait for
Support. See inside front cover
PowerView Display Messages
Index
Electro-static discharge, 2-1 Emergency power off
Configuring PowerView Threshold status
Description
Checklist Input Output Overview Repo
Configuring
Description, 1-4 Installation Ordering information
Frame, 2-1 Modules
Replacement Modules & Accessories
English Text
Related pages
All Power page
Power Distribution for HP dc5850
DC power cord for server blade for HP BL p-Class System 230859-004
Max. Power Saving for Samsung LH32EDDPLGC/EN
Powerful Pan/Tilt Functions for Speco Technologies HTSD37X
Power, Ground Cabling and LIU for Australia for NEC 120
Motor Power Cable CBL-MTRPWR1CEL-5 for Elmo CBL-MTRENC4
Power Subsystem for NEC NEC Versa 2500 Series User's Guide 25-10584-00
Power will turn off and then back on for Samsung HT-X810T/ADL
Transmit-power for SMC Networks SMC2555W-AG
What is the significance of progressive scanning in JVC camcorders?
Read more
Top
Page
Image
Contents