Chapter 4 - Electrical Requirements and Procedures

Contact Closure REPO Switch Connection

Connect the contact closure REPO wiring to the terminal block as illustrated in figure 4-9 below.

Note: The factory installed jumper remains as shown.

Jumper Installed

Fig 4-9 Dry Contact Switch

24 Vdc REPO Switch Connection

Connect the 24Vdc REPO wiring to the terminal block as illustrated in figure 4-10 below.

Note: The factory installed jumper must be removed.

24Vdc Power Source

Fig 4-10 24Vdc EPO Switch

Electrical Wiring Test

The following test procedure will ensure that the Power Ar- ray has been correctly hardwired. The qualified electrician who installed the Power Array should perform this test. A true RMS voltmeter and a ground ohmmeter are required.

Before this test can be conducted, the main intelligence mod- ule (MIM) must be installed, and the PowerView display must be connected to the Power Array. Refer to Chapter 5 for pro- cedures to install the MIM and the PowerView.

IMPORTANT: Make sure the power modules and the battery modules ARE NOT installed for this test.

Note: This test is intended to verify the electrical connection to the Power Array, not to verify its operation or explain its usage. In this procedure, you will be instructed to ignore PowerView messages, etc. Refer to Chapters 6 & 7 for detailed information about the operation of the Power Array.

Electrical Wiring Test/Checklist

q1. Make sure all three switches -- system enable, mainte- nance bypass, and input circuit breaker -- are in the “off” or “stand by” position.

IMPORTANT: Make sure all load equipment is either turned off or is unplugged from the Power Array.

q2. Use a true RMS voltmeter to measure the input AC utility (mains) voltagte to the terminal connections at the rear of the frame (bottom level).

Note: If input voltage is less than 156Vrms or greater than 276Vrms, check input wiring for errors. DO NOT PRO-

CEED UNTIL THE INPUT VOLTAGE IS WITHIN THIS RANGE.

Record the input voltage here: ____________________

q3. Check for proper ground installation with a ground ohmmeter. Check for continuity to building ground.

q4. Switch the input circuit breaker to the “on” position.

q5. Switch the system enable switch to the “on” position. Note: The Power Array may make a series of clicking sounds as it runs through an initial self test.

4-6

Image 34
Contents Page Toll-Free Numbers Main Tech Support+353 91 0660Important Safety Instructions Radio Frequency InterferenceLimited Warranty Life Support PolicyTable of Contents Index Introduction MiniFrame MasterFrameThank You SymmetraTM Overview Power Processing Battery SourceFig I-2 Functional Diagram of a SymmetraTM Theory of OperationBattery Source Power Processing SystemControl/User Interface On-Line Operating Mode Load-Disconnect ModeModes of Operation On-Battery Operating Mode Bypass Operating ModeDefinitions Important InformationPage Safety Information Important Safety InformationSymbols Used In This Manual Safety Earth Ground Indicates the pri- mary safety groundSafety-2 Physical Representation Module Power Array FrameFive Four Power Battery BaysBattery Module Powerview User InterfacePower Module Power ModuleRedundant Intelligence Module RIM Maintenance Bypass SwitchMain Intelligence Module MIM Input Circuit BreakerRear View of a Power Array Site Preparation Operating Conditions Space and Weight ConsiderationsTransporting Power Array to Installation Site BTU OutputSite Preparation Unpacking and Installing Frame Move the Frame Dimensions WeightInitial Inspection Check For DamageRemove Packing Materials Moving Battery & Power ModulesRemove the Frame from the Pallet Wiring Requirements & Procedures Output Wiring SymmetraTM WiringInput Wiring Repo Switch WiringInput Wiring Specifications Input WiringInput Wiring Procedures Ground Wiring Terminal Block Ground Wiring and Input Wiring Terminal BlocksOutput Wiring Output Wiring InstallationRepo Switch Installation Remote Emergency Power Off SwitchRepo Specifications Cable SpecificationsContact Closure Repo Switch Connection Electrical Wiring TestElectrical Wiring Test/Checklist Vdc Repo Switch ConnectionRecord the PowerView reported 11 Startup ScreenSetting Up The Power Array Removing Grill Covers Setup of Power ArrayFrame Leveling Procedure PositionsClear all battery module bays of any debris Installing the Battery ModulesProcedure for Battery Module Installation Battery Module Location of Battery Module BaysInstalling the Power Modules Procedure for Power Module InstallationMain Intelligence Module Installing the Main Intelligence Module MIMInstalling the Redundant Intelligence Module RIM 10 Location of the MIM and RIMWall Mounting the PowerView Installing the PowerView InterfaceRemote Placement of the PowerView Remove the grill cover from the top level of the frameSmartSlotTM Interface Accessories Installation Test Installation Test/ChecklistSymmetraTM Power Module/Frame Capacities Power Reported21 Miscellaneous Status Screen 22 Power The Load Sequence 25 Return to On-Line Mode System Setup PowerView Display PowerView Functions Physical Features of the PowerviewPowerView Interface Esc PowerView LED IndicatorsSymbol Name Function of Key On Key Navigation KeysControl Startup ScreenTop-Level Menu Screen StatusDiagnostics SetupAccessories LoggingConfiguring & Operating the SymmetraTM Powering the Power Array IntroductionVoltage Status Screen Powering the LoadsReview Status Conditions Load With No Redundancy Status ScreenPower Status Screen Load With Redundancy Status Screen Battery Status ScreenFrequency Status Screen Perform a Self Test Alarm Threshold Status Screen11 Sample Alarm Threshold Status Screen Miscellaneous Status ScreenSwitching Audible Alarm Beeper Off Configure AlarmsAlarm Thresholds Selection Screen Shutdown Parameter Selection ScreenReview Logging Menu Review Diagnostic InformationDiagnostics Menu Screen Event Log ScreenModule Replacement Module Failure Alarm Indicators Module ReplacementReturning Modules to APC Installing the Replacement Module Battery Module ReplacementReplacement Battery Module Verification Replacement Module Verification Power Module ReplacementRefer to for the power module installation proce- dure Replacement MIM Verification Redundant Intelligence Module ReplacementInstalling the Replacement Main Intelligence Module Installing the Replacement Redundant Intelligence ModulePowerView Interface Messages MIM detects the RIM before PowerView Meaning Corrective Action Message Start-UpRIM is awake Load is No Longer above PowerView Meaning Corrective Action Message# of batteries decreased Has been corrected either becauseSelect zero Setup-Alarms-RedundancyThreshold. Startup-Setup-Alarms Redundancy-selectBattery modules are being Because of a power failure, wait forSupport. See inside front cover PowerView Display Messages Index Electro-static discharge, 2-1 Emergency power off Configuring PowerView Threshold statusDescription Checklist Input Output Overview Repo ConfiguringDescription, 1-4 Installation Ordering information Frame, 2-1 ModulesReplacement Modules & Accessories English Text