| Table of Contents |
|
Section 1 | Warranty | 7 |
Section 2 | Safety First | 9 |
| Safety Alert Symbol | 10 |
| Safety Alert Decals | 11 |
| Safety Precautions | 15 |
Section 3 | Contol Panel | 17 |
| Switch Panel Layout | 18 |
| Keypad Layout | 20 |
Section 4 | Dryer Pre Season Checks | 29 |
| Inspect the Metering Rolls | 30 |
| Electrical Power | 30 |
| Control Power Switch | 30 |
| Run Button | 30 |
| Fuel Check | 30 |
| Load Auger | 31 |
| Unload One Speed Operation | 31 |
| Unload Two Speed Operation | 31 |
| Meter Roll Operation | 31 |
| Fan Switches | 32 |
| Burner Safety | 32 |
| Burner Test Fire | 32 |
| Dryer Shutdown | 33 |
| Emergency Dryer Shutdown | 33 |
Section 5 | Dryer Startup and Operation | 35 |
| Initial Setup Parameters | 36 |
| Startup | 41 |
| Continuous Flow Drying Mode | 42 |
| Staged Batch Drying Mode | 44 |
| Operating Display Screens | 47 |
Section 6 | Safety Circuit Shutdown Messages | 49 |
| Fan and Heater Generated Errors | 50 |
| Input/Output Generated Errors | 53 |
| Master Display Generated Errors | 55 |
Section 7 | Service and Maintanance | 57 |
| Seasonal Inspection and Service | 58 |
| Lubrication Procedure | 58 |
| Fan Blade Removal and Installation | 59 |
| Fan Motor Removal | 61 |
| Heater Parts Removal and Installation | 61 |
| Meter Roll Servicing | 62 |
| Trouble Analysis Procedure | 64 |
Section 8 | Special Setup Screens | 69 |
| Meter Roll Disable | 70 |
| Air Switch Testing | 70 |
3 |