
1. Press the | button. Press | (enter twice) to bypass the other screens. |
2. Press the | button. |
3. Press the | button to adjust the settings. |
4. Press the | button to accept the changes. |
Unload Delay
The unload delay is used to control the amount of time the unload auger runs after the metering rolls stop to allow the unload auger to clean itself out.
To change the setting of this delay follow these instructions:
1.Press the
button. Press ![]()
![]()
(enter three times) to bypass the other screens.
2.Press the
button.
3. | Press the | button to adjust the settings. |
4. | Press the | button to accept the changes. |
| 39 | |