Xanbus Automatic Generator Start Installation
Connect one or two network cables as required by the installation configuration.
Figure 26 Connecting the Xanbus System Control Panel (SCP)
Verifying Power Is Available
When the AGS has been installed properly, the Power and Network indicator lights illuminate.
If one or both lights are out, check the network connections. Check the Xanbus to ensure it has battery power. Check to make sure the other devices in the network, such as the Xanbus System Control Panel (SCP), are responding to confirm the network is still active.
Verify Power and Network indicator lights are illuminated.
Figure 27 Verifying Power is Available
| 35 |