Start-Up - 2:1 Staged Control

1. Send Unit to High Fire

Send the unit to high fire by setting the temperature selector to its maximum setting.

2. Check the High Fire

Manifold Pressure

Using a manometer, measure the burner manifold pressure at the manifold pressure test port. Refer to the Gas Train Layout in the Reference section for the test port location.

The pressure on high fire should be 3-1/2 in. wg for natural gas and 10 in. wg for LP gas.

If needed, use the high fire adjustment screw on the combination gas valve to adjust the high fire manifold pressure. Counterclockwise rotation will decrease the gas pressure and clockwise rotation will increase the gas pressure.

High Fire

Low Fire

High Fire

Adjustment

Adjustment

Terminal

3. Send Unit to Low Fire

Remove and isolate the wire from the high fire terminal on the combination gas valve to send the unit to low fire.

4. Check the Low Fire Manifold Pressure

Using a manometer, measure the burner manifold pressure at the manifold pressure test port. Refer to

the Gas Train Layout in the Reference section for the

test port location.

 

 

 

 

Two Stage Manifold

 

 

The pressure on low fire

Pressure (in. wg)

should be 7/8 in. wg

 

Natural Gas

LP

for natural gas and

 

 

 

Low Fire

7/8

2-1/2

2-1/2 in. wg for LP

 

 

 

High Fire

3-1/2

10

gas.

 

 

 

 

 

 

If needed use the low fire adjustment screw on the combination gas valve to adjust the low fire manifold pressure. Counterclockwise rotation will decrease the gas pressure and clockwise rotation will increase the gas pressure. Once the low fire manifold pressure is set, reattach the high fire wire to the high fire terminal.

5. Reset the Temperature Setting

Reset the temperature setting on the temperature selector to the desired setting.

Start-Up - 8:1 Staged Control

important

8:1 staged furnaces use two manifolds and two staged gas valves per furnace. The high and low fire manifold pressure must be checked and properly set on each manifold.

important

Confirm that the discharge air sensor is installed in the duct, at least three duct diameters downstream of the furnace.

1. Send the Unit to High Fire

For the furnace to light, the heat switch must be closed or jumpered out. Reference the unit ladder diagram for proper terminals to jumper.

To send the unit to high fire, press and hold the Up, Down and Enter keys. The middle LED light, L2, will flash on the screen when the unit is forced to high fire.

The unit will remain at high fire until the Function key is pressed (middle LED light, L2, will stop flashing).

L1 L2 L3

Function

Up

Enter

Down

Warning

Once the unit is forced to high fire, it will remain at high fire until the Function key is pressed.

note

Forcing the unit to high fire during warm or hot weather conditions may cause the high limit switch to trip. If the switch trips, it will reset once the discharge air temperature has reached a safe level.

2.Check the High Fire Manifold Pressure

Using a manometer, measure the high fire burner manifold pressure for each furnace at the pressure test port. Refer to the Gas Train Layout in the Reference section for the test port location.

The recommended high fire manifold pressure is

3-1/2 in. wg for natural gas and 10 in. wg for LP gas.

If needed, adjust the high fire screws on each staged gas valve to set both high fire manifold pressures. Counterclockwise rotation will decrease the gas pressure and clockwise rotation will increase the gas pressure.

26 Model IG / IGX Make-Up Air

®

Image 26
Contents Installation, Operation and Maintenance Manual General Safety InformationHandling Inspection and Maintenance during StorageReceiving StorageTable of Contents Clearance to Combustibles / Service ClearancesInstallation of Indoor Unit Installation of Arrangement DB / HZInstall Curb/Equipment Supports Installation of Roof Mounted Unit Arrangement DBCInstall Combination Curb Adaptor Assemble and Attach WeatherhoodInstall Supply Unit Install Exhaust FanInstall Exhaust Options Installation of Evaporative Cooling Module optional Installation of Venting for Outdoor UnitsStandard Indoor Venting Installation of Venting for Indoor UnitsVenting Methods Separated Combustion Concentric VentingVent Pipe Diameter Installation of Standard Indoor VentingInstalling Exhaust Vent Pipe Installation of Concentric Venting General Concentric Venting HorizontalConcentric Venting Vertical Intake END Installation of Two Pipe Venting Horizontal Seal Wall OpeningsInstallation of Two Pipe Venting Vertical Seal Roof PenetrationInstallation Electrical Wiring Install Discharge Air Sensor optional Wire the Evaporative Cooler optionalInstall Economizer Sensors optional Install DDC Interface OptionalDetermine the Supply Gas Requirements Installation of Gas PipingInstall Additional Regulator if Required Connect the Supply Gas LineInstall the Drain Line Installation Evaporative Cooler Piping optionalInstall the Water Supply Line Check/Adjust Water LevelInstall Normally Open Drain Line/ Solenoid Installation of Water WizardTM optionalInstall Normally Closed Supply Line/ Solenoid Water Wizard Valves When provided by manufacturerWire the Solenoids Installation of Water WizardInstallation Direct Expansion DX Coil Piping optional Wire the Temperature SensorCheck Coil Piping for Leaks Install Suction LineMount the Remote Sensing Bulb By Others Evacuate and Charge the CoilInstallation of Chilled Water Coil Piping optional Installation of Building Pressure Control optionalStart-Up Blower Set-up Optional Components Start-Up Single Stage Control Reset the Temperature SettingStart-Up Furnaces all units Send Unit to High FireSend Unit to Low Fire Start-Up 21 Staged ControlStart-Up 81 Staged Control Check the Low Fire Manifold PressureEdit the Setting Access the Setpoints MenuAccess the Discharge Air Temperature Setting Access the Inlet Air Sensor SettingAccess the Room Override Setting High Fire Adjustment Start-Up 21 Electronic ModulationCheck the Low Fire Manifold Pressures Exit High Fire ModeStart-Up 41 Electronic Modulation Access the Setpoints Menu Set Minimum Outside Air Verify Sensor InstallationStart-Up Economizer optional Set the Enthalpy Changeover Set Point optionalStart-Up Evaporative Cooling optional Start-Up Water Wizard optional Operation - Water Wizard optional Building Pressure Control External Signal a variableCheck Operation VAV Units optional Building Pressure Control a Check Operation Recirculating Units optionalRecirculation Operation Damper actuator may take a fewSequence of Operation Staged Sequence Exhaust Fan Contact S1 Manually Closed optionalSequence of Operation 21 Modulation Sequence Sequence of Operation Modulation Sequence Discharge Air Temperature dtSOutside Air Temperature OAt Operation Modulation Staged ControllerOptional Room Override ROt Sequence of Operation 41 Electronic ModulationProgram Revision Number Light Off BlinkingSequence of Operation Electronic Modulation Sequence of Operation Staged Control Staging Control Sequence of OperationOperation and Errors Ignition Controller Following are the green LED codes of operationOperation Economizer Option EC-1 Outside Air Temperature ReferenceOption EC-3 Differential Temperature Control Option EC-2 Outside Air Enthalpy ReferenceTroubleshooting Blower Does Not OperateMotor Over Amps Insufficient Airflow Too Much AirflowExcessive Noise or Vibration Single or 21 Stage Furnace Will Not Light Improper manifold pressureModulating Furnace Will Not Light Heat transformer TR2 fault Ignition controllers IC# failed Staged Furnace Will Not Light Internal high limit tripped temperature above set point Evaporative Cooler does not Operate Recirculating pump Water Blows through Evaporative CoolerWater Wizard Improper Water Supply Adjust the Manual Supply ValveAdjust the On Time Factor Snow Accumulation Maintenance RoutineBelt Drives WheelsChilled Water Coils MotorsFilters Evaporative CoolersMaintenance Fall Flushing Coils Reference Model IG Venting Connection Location Reference Model IGX Venting Connection LocationReference Model IG Single or 2 Stage Reference Model IG Staged Reference Model IG Modulation Modulating Reference Model IGX Blower Control Center Manifold Gas Pressure Test Port Staged Inch Gas Supply Manifold Gas Pressure Test Port Modulating Staged Reference Performance Table Performance TableReference Start-Up Checklist Start-Up ChecklistMaintenance Log Warranty