Greenheck Fan 470656 manual Installation of Two Pipe Venting Horizontal, Seal Wall Openings

Page 13

Installation of Two Pipe Venting – Horizontal

Refer to the diagram below for venting on horizontal concentric systems. Maintain at least 12 inches of clearance between the exhaust pipe termination and the exterior surface of the exterior wall (Dim. A).

The combustion air pipe must be a minimum of 12 inches from the exhaust pipe and 24 inches from the exterior surface of the outside wall (Dim. B).

A minimum of 1 inch and a maximum of 48 inches of building wall thickness is required for separated combustion vent pipe.

A = 12 inch minimum

 

B = 24 inch minimum

Exterior

C = 12 inch minimum

Wall

 

 

 

Exhaust

 

 

Vent

 

 

Terminal

 

 

B

 

 

A

 

EXHAUST

 

 

 

C

Pitch vent pipe

COMBUSTION AIR

 

downward

 

 

 

from furnace

 

 

¼ inch per foot

Two (2) field-supplied

 

 

support brackets

 

 

 

Combustion

 

 

Air Inlet

 

 

Terminal

Vent Connection Diameter

Vent terminals must be used. The optional vent kit includes two terminals. Construct the vent system as shown in the drawings and refer to the table for the correct vent connection diameters.

Furnace Size

Exhaust

Combustion

(MBH)

(inches)

(inches)

 

 

 

75 - 175

4

4

 

 

 

200 - 400

6

6

 

 

 

Vent Length

Refer to table for minimum and maximum vent lengths. The minimum vent length is 5 feet and the maximum vent length is 50 feet. The total equivalent vent length must include elbows. The equivalent length of a 4 inch elbow is 6 feet and the equivalent length of a 6 inch elbow is 10 feet.

Vent

Minimum

Maximum

Length

(feet)

(feet)

 

 

 

Horizontal

5

50

 

 

 

1. Install Exhaust Pipe

Run an exhaust pipe from the unit’s combustion exhaust through the exterior wall to the outdoors. The exhaust pipe must terminate at least 12 inches from the outside surface of the outside wall. Attach exhaust vent terminal to the end of the exhaust pipe. Using field-supplied mounting brackets, support the exhaust pipe as needed.

®

2. Install Combustion Air Pipe

Run a combustion air pipe from the unit’s combustion air intake through the exterior wall to the outdoors. The combustion air pipe must terminate at least 12 inches from the combustion vent pipe and 24 inches from the exterior surface of the outside wall. Attach the combustion air inlet guard to the end of the combustion air pipe. Using field-supplied mounting brackets, support the combustion air pipe as needed.

3. Seal Wall Openings

Using an appropriate method, seal the wall openings around the piping.

INTAKE END

Exhaust Connection

Exhaust Connection

(Model IGX)

(Model IG)

DISCHARGE

END

Combustion Air Connection

Combustion Air Connection

(Model IGX)

(Model IG)

Model IG / IGX Make-Up Air 13

Image 13
Contents General Safety Information Installation, Operation and Maintenance ManualReceiving Inspection and Maintenance during StorageHandling StorageClearance to Combustibles / Service Clearances Table of ContentsInstallation of Arrangement DB / HZ Installation of Indoor UnitInstall Combination Curb Adaptor Installation of Roof Mounted Unit Arrangement DBCInstall Curb/Equipment Supports Assemble and Attach WeatherhoodInstall Exhaust Options Install Exhaust FanInstall Supply Unit Installation of Venting for Outdoor Units Installation of Evaporative Cooling Module optionalVenting Methods Installation of Venting for Indoor UnitsStandard Indoor Venting Separated Combustion Concentric VentingInstalling Exhaust Vent Pipe Installation of Standard Indoor VentingVent Pipe Diameter Concentric Venting Horizontal Installation of Concentric Venting GeneralConcentric Venting Vertical Intake END Seal Wall Openings Installation of Two Pipe Venting HorizontalSeal Roof Penetration Installation of Two Pipe Venting VerticalInstallation Electrical Wiring Install Economizer Sensors optional Wire the Evaporative Cooler optionalInstall Discharge Air Sensor optional Install DDC Interface OptionalInstall Additional Regulator if Required Installation of Gas PipingDetermine the Supply Gas Requirements Connect the Supply Gas LineInstall the Water Supply Line Installation Evaporative Cooler Piping optionalInstall the Drain Line Check/Adjust Water LevelInstall Normally Closed Supply Line/ Solenoid Installation of Water WizardTM optionalInstall Normally Open Drain Line/ Solenoid Water Wizard Valves When provided by manufacturerInstallation Direct Expansion DX Coil Piping optional Installation of Water WizardWire the Solenoids Wire the Temperature SensorMount the Remote Sensing Bulb By Others Install Suction LineCheck Coil Piping for Leaks Evacuate and Charge the CoilInstallation of Building Pressure Control optional Installation of Chilled Water Coil Piping optionalStart-Up Blower Set-up Optional Components Start-Up Furnaces all units Reset the Temperature SettingStart-Up Single Stage Control Send Unit to High FireStart-Up 81 Staged Control Start-Up 21 Staged ControlSend Unit to Low Fire Check the Low Fire Manifold PressureAccess the Discharge Air Temperature Setting Access the Setpoints MenuEdit the Setting Access the Inlet Air Sensor SettingAccess the Room Override Setting Start-Up 21 Electronic Modulation High Fire AdjustmentStart-Up 41 Electronic Modulation Exit High Fire ModeCheck the Low Fire Manifold Pressures Access the Setpoints Menu Start-Up Economizer optional Verify Sensor InstallationSet Minimum Outside Air Set the Enthalpy Changeover Set Point optionalStart-Up Evaporative Cooling optional Start-Up Water Wizard optional Operation - Water Wizard optional Check Operation VAV Units optional External Signal a variableBuilding Pressure Control Recirculation Operation Check Operation Recirculating Units optionalBuilding Pressure Control a Damper actuator may take a fewExhaust Fan Contact S1 Manually Closed optional Sequence of Operation Staged SequenceSequence of Operation 21 Modulation Sequence Outside Air Temperature OAt Discharge Air Temperature dtSSequence of Operation Modulation Sequence Operation Modulation Staged ControllerProgram Revision Number Sequence of Operation 41 Electronic ModulationOptional Room Override ROt Light Off BlinkingSequence of Operation Electronic Modulation Staging Control Sequence of Operation Sequence of Operation Staged ControlFollowing are the green LED codes of operation Operation and Errors Ignition ControllerOption EC-3 Differential Temperature Control Option EC-1 Outside Air Temperature ReferenceOperation Economizer Option EC-2 Outside Air Enthalpy ReferenceBlower Does Not Operate TroubleshootingMotor Over Amps Too Much Airflow Insufficient AirflowExcessive Noise or Vibration Improper manifold pressure Single or 21 Stage Furnace Will Not LightModulating Furnace Will Not Light Heat transformer TR2 fault Ignition controllers IC# failed Staged Furnace Will Not Light Internal high limit tripped temperature above set point Water Blows through Evaporative Cooler Evaporative Cooler does not Operate Recirculating pumpAdjust the On Time Factor Adjust the Manual Supply ValveWater Wizard Improper Water Supply Belt Drives Maintenance RoutineSnow Accumulation WheelsFilters MotorsChilled Water Coils Evaporative CoolersMaintenance Fall Flushing Coils Reference Model IGX Venting Connection Location Reference Model IG Venting Connection LocationReference Model IG Single or 2 Stage Reference Model IG Staged Reference Model IG Modulation Modulating Reference Model IGX Blower Control Center Manifold Gas Pressure Test Port Staged Inch Gas Supply Manifold Gas Pressure Test Port Modulating Staged Performance Table Reference Performance TableStart-Up Checklist Reference Start-Up ChecklistWarranty Maintenance Log