Greenheck Fan 470656 manual Table of Contents, Clearance to Combustibles / Service Clearances

Page 3

3.After storage period, purge grease before putting fan into service.

Indirect Gas Fired Unit Installations

Units are listed for installation in the United States and Canada.

Installation of gas fired duct furnaces must conform with local building codes. In the absence of local codes, installation must conform to the National Fuel Gas code, ANSI Z223.1 or in Canada, CAN/ CGA-B149 installation codes.

All electrical wiring must be in accordance with the regulation of the National Electrical Code, ANSI/ NFPA 70.

Unit is approved for installation downstream from refrigeration units. In these conditions, condensate could form in the duct furnace and provision must be made to dispose of the condensate.

Table of Contents

Installation

Clearance to Combustibles/Service Clearances. 3

Indoor Unit

 

 

4

Unit Arrangement DB / HZ

. . 4-5

Roof Mounted Unit – Arrangement DBC. .

. . 5-6

Optional Evaporative Cooling Module.. . .

.

.

7

Venting – Outdoor

.

.

. 7

Indoor, All Units

 

 

8

Standard Indoor . . . . . . . . . . .9

Concentric, General

.

.

.10

Concentric, Horizontal

.

10-11

Concentric, Vertical

 

11-12

Two Pipe, Horizontal

 

 

13

Two Pipe, Vertical

.

.

.14

Electrical Wiring . . . . . . . . . . . . . 15-16

Gas Piping. . . . . . . . . . . . . . . . .17

Optional Evaporative Cooler Piping . . . .

 

18-19

Optional Water Wizard™

.

19-20

Optional Direct Expansion (DX) Coil Piping. 20-21

Optional Chilled Water Coil Piping

 

 

22

Optional Building Pressure Control. . . .

.

.

.22

Start-Up

Blower. . . . . . . . . . . . . . . . . 23-24

Furnace – All Units

.

. 25

Single Stage

 

25

2:1 Staged. . . . . . . . . . . . 26

8:1 Staged. . . . . . . . . . . 26-28

2:1 Modulation

 

29

4:1 Modulation

30-31

Optional Economizer . . . . . . . . . . . . 32

Optional Evaporative Cooling

 

33

Optional Water Wizard™

34-35

Operation

 

 

Optional Water Wizard™

.

.35

Optional VAV Units

.

. 36

Optional Recirculating Units

 

37

®

Sequence of Operation, Furnace –

2:1 Staged . . . . . . . . . . . . . . .38 2:1 Modulation. . . . . . . . . . . . 39-40

Operation of Controller –

4:1 Modulation/8:1 Staged Controller. . 40-41 Sequence of Operation, Furnace –

4:1 Modulation. . . . . . . . . . . . 41-42 8:1 Staged . . . . . . . . . . . . . 43-44 Ignition Controller. . . . . . . . . . . . . .44 Economizer. . . . . . . . . . . . . . . . 45

Troubleshooting

Blower. . . . . . . . . . . . . . . . . . 46

Motor Over Amps

. . . .

.

.47

Insufficient / Too Much Airflow

. . .

 

 

48

Excessive Noise / Vibration. . . .

. . .

.

.

.49

Furnace – Staged

. . . .

.

.50

2:1 Modulation

. .

 

 

51

4:1 Modulation

 

 

52-53

8:1 Staged. . . . . . . . . . . 54-55

Optional Evaporative Cooling

. .

 

 

56

Optional Water Wizard™

. . .

.

.

.57

Maintenance

Routine . . . . . . . . . . . . . . . . 58-59 Fall. . . . . . . . . . . . . . . . . . 60-61

Reference

Vent Connections . . . . . . . . . . . . . .62

Model IG – Single or 2 Stage

.

.

63

8:1 Staged . . . . . . . . . . . .64

2:1 Modulation

.

.

65

4:1 Modulation

.

.

66

Model IGX – Blower Control Center

 

 

67

Single or 2 Stage

.

.

68

8:1 Staged . . . . . . . . . . . .68

2:1 Modulation

.

.

69

4:1 Modulation

.

.

69

Performance Table . . . . . . . . . . . . . 70

Start-Up Checklist

 

 

71

Maintenance Log . . . . . . . . . . Backcover Warranty . . . . . . . . . . . . . . Backcover

Clearance to Combustibles / Service Clearances

 

Floor

Top

Sides

Ends

 

 

 

 

 

Indirect Fired

0 inches

0 inches

0 inches

0 inches

Units*

(0 mm)

(0 mm)

(0 mm)

(0 mm)

Clearance to combustibles is defined as the minimum distance required between the heater and adjacent combustible surfaces to ensure the adjacent surface’s temperature does not exceed 90 degrees above the ambient temperature.

*Reference venting guidelines for combustion blower clearances.

Recommended Minimum Service Clearances

Housing 32

42 inches (1067 mm) on the

and less

controls side of the unit

Clearances for component removal (such as evaporative cooler media) should be 6 in. wider than the width of the module itself.

Model IG / IGX Make-Up Air 3

Image 3
Contents General Safety Information Installation, Operation and Maintenance ManualStorage Inspection and Maintenance during StorageReceiving HandlingClearance to Combustibles / Service Clearances Table of ContentsInstallation of Arrangement DB / HZ Installation of Indoor UnitAssemble and Attach Weatherhood Installation of Roof Mounted Unit Arrangement DBCInstall Combination Curb Adaptor Install Curb/Equipment SupportsInstall Exhaust Fan Install Exhaust OptionsInstall Supply Unit Installation of Venting for Outdoor Units Installation of Evaporative Cooling Module optionalSeparated Combustion Concentric Venting Installation of Venting for Indoor UnitsVenting Methods Standard Indoor VentingInstallation of Standard Indoor Venting Installing Exhaust Vent PipeVent Pipe Diameter Concentric Venting Horizontal Installation of Concentric Venting GeneralConcentric Venting Vertical Intake END Seal Wall Openings Installation of Two Pipe Venting HorizontalSeal Roof Penetration Installation of Two Pipe Venting VerticalInstallation Electrical Wiring Install DDC Interface Optional Wire the Evaporative Cooler optionalInstall Economizer Sensors optional Install Discharge Air Sensor optionalConnect the Supply Gas Line Installation of Gas PipingInstall Additional Regulator if Required Determine the Supply Gas RequirementsCheck/Adjust Water Level Installation Evaporative Cooler Piping optionalInstall the Water Supply Line Install the Drain LineWater Wizard Valves When provided by manufacturer Installation of Water WizardTM optionalInstall Normally Closed Supply Line/ Solenoid Install Normally Open Drain Line/ SolenoidWire the Temperature Sensor Installation of Water WizardInstallation Direct Expansion DX Coil Piping optional Wire the SolenoidsEvacuate and Charge the Coil Install Suction LineMount the Remote Sensing Bulb By Others Check Coil Piping for LeaksInstallation of Building Pressure Control optional Installation of Chilled Water Coil Piping optionalStart-Up Blower Set-up Optional Components Send Unit to High Fire Reset the Temperature SettingStart-Up Furnaces all units Start-Up Single Stage ControlCheck the Low Fire Manifold Pressure Start-Up 21 Staged ControlStart-Up 81 Staged Control Send Unit to Low FireAccess the Inlet Air Sensor Setting Access the Setpoints MenuAccess the Discharge Air Temperature Setting Edit the SettingAccess the Room Override Setting Start-Up 21 Electronic Modulation High Fire AdjustmentExit High Fire Mode Start-Up 41 Electronic ModulationCheck the Low Fire Manifold Pressures Access the Setpoints Menu Set the Enthalpy Changeover Set Point optional Verify Sensor InstallationStart-Up Economizer optional Set Minimum Outside AirStart-Up Evaporative Cooling optional Start-Up Water Wizard optional Operation - Water Wizard optional External Signal a variable Check Operation VAV Units optionalBuilding Pressure Control Damper actuator may take a few Check Operation Recirculating Units optionalRecirculation Operation Building Pressure Control aExhaust Fan Contact S1 Manually Closed optional Sequence of Operation Staged SequenceSequence of Operation 21 Modulation Sequence Operation Modulation Staged Controller Discharge Air Temperature dtSOutside Air Temperature OAt Sequence of Operation Modulation SequenceLight Off Blinking Sequence of Operation 41 Electronic ModulationProgram Revision Number Optional Room Override ROtSequence of Operation Electronic Modulation Staging Control Sequence of Operation Sequence of Operation Staged ControlFollowing are the green LED codes of operation Operation and Errors Ignition ControllerOption EC-2 Outside Air Enthalpy Reference Option EC-1 Outside Air Temperature ReferenceOption EC-3 Differential Temperature Control Operation EconomizerBlower Does Not Operate TroubleshootingMotor Over Amps Too Much Airflow Insufficient AirflowExcessive Noise or Vibration Improper manifold pressure Single or 21 Stage Furnace Will Not LightModulating Furnace Will Not Light Heat transformer TR2 fault Ignition controllers IC# failed Staged Furnace Will Not Light Internal high limit tripped temperature above set point Water Blows through Evaporative Cooler Evaporative Cooler does not Operate Recirculating pumpAdjust the Manual Supply Valve Adjust the On Time FactorWater Wizard Improper Water Supply Wheels Maintenance RoutineBelt Drives Snow AccumulationEvaporative Coolers MotorsFilters Chilled Water CoilsMaintenance Fall Flushing Coils Reference Model IGX Venting Connection Location Reference Model IG Venting Connection LocationReference Model IG Single or 2 Stage Reference Model IG Staged Reference Model IG Modulation Modulating Reference Model IGX Blower Control Center Manifold Gas Pressure Test Port Staged Inch Gas Supply Manifold Gas Pressure Test Port Modulating Staged Performance Table Reference Performance TableStart-Up Checklist Reference Start-Up ChecklistWarranty Maintenance Log