Installation of Indoor Unit

NOTE

To prevent premature heat exchanger failure, do not locate units where chlorinated, halogenated, or acid vapors are present.

1. Install Hangers

Install threaded hangers from ceiling supports. When locating hangers, allow enough room to open access panel(s). Two nuts must be used on the end of each threaded hanger. Ceiling supports are supplied by others.

2. Install Unit

Raise the unit into place. Using two nuts per hanger, fasten the unit supports to hangers under the unit. Appropriate unit supports, such as the optional manufacturer hanging bracket kit or c-channel and angle iron (supplied by others) should be used.

Using self-tapping screws, attach ductwork to unit. In order to prevent the unit from swinging and to provide a safe environment for service and maintenance, additional measures must be taken to secure the unit in all directions.

Ceiling Supports

Ductwork

 

Hangers

Unit Supports

Indoor Mounting

NOTE

Two nuts must be used on each end of each threaded hanging rod for proper support.

WARNING

All factory-provided lifting lugs must be used when lifting any unit. Failure to comply with this safety precaution could result in property damage, serious injury or death.

NOTE

Good duct practices should be followed for all ductwork. Ductwork should be installed in accordance with SMACNA and AMCA guidelines, NFPA 96 and any local codes. Reference the CAPS submittal for duct sizes.

3. Install Vent Piping

Refer to the Indoor Venting Instructions. Refer to your unit submittal to determine the correct venting option.

NOTE

Vent piping is supplied by others and not supplied by manufacturer.

4Model IG / IGX Make-Up Air

Installation of Arrangement DB / HZ

1.Install Curb and/or Equipment Support(s)

Position curb/equipment support(s) on the roof (reference the CAPS submittal for placement of curb/ equipment support(s) in relation to the unit). Verify that unit supports are level, shim if necessary. Attach curb to roof and flash into place. Attach the equipment support(s) to the roof, remove metal cover, flash to wooden nailer and reinstall cover.

Roof Curb

Metal Cover

Equipment

Support

Roof Curb and Equipment Support

2. Install Ductwork

Good duct practices should be followed for all ductwork. All ductwork should be installed in accordance with SMACNA and AMCA guidelines, NFPA 96 and all local codes. Reference the CAPS submittal for ductwork sizes.

Supply Air Ductwork (Arrangement DB only)

Ductwork

NOTE

The use of a duct adapter is recommended on a downblast (DB) arrangement to align the ductwork with the supply unit. The duct adapter is only a guide and is not to be used as support for the ductwork.

3. Apply Sealant

Apply an appropriate sealant around the perimeter of the curb and duct adapter(s) to isolate fan vibration and prevent water penetration.

4. Install Unit

Use a crane and a set of spreader bars hooked to the

factory lifting lugs to lift and center the unit on the curb/equipment support(s).

Use self-tapping

 

sheet metal

 

screws to fasten

 

the unit to the

 

curb/equipment

 

support(s).

Setting Unit

 

®

Image 4
Contents Installation, Operation and Maintenance Manual General Safety InformationInspection and Maintenance during Storage ReceivingHandling StorageTable of Contents Clearance to Combustibles / Service ClearancesInstallation of Indoor Unit Installation of Arrangement DB / HZInstallation of Roof Mounted Unit Arrangement DBC Install Combination Curb AdaptorInstall Curb/Equipment Supports Assemble and Attach WeatherhoodInstall Exhaust Options Install Exhaust FanInstall Supply Unit Installation of Evaporative Cooling Module optional Installation of Venting for Outdoor UnitsInstallation of Venting for Indoor Units Venting MethodsStandard Indoor Venting Separated Combustion Concentric VentingInstalling Exhaust Vent Pipe Installation of Standard Indoor VentingVent Pipe Diameter Installation of Concentric Venting General Concentric Venting HorizontalConcentric Venting Vertical Intake END Installation of Two Pipe Venting Horizontal Seal Wall OpeningsInstallation of Two Pipe Venting Vertical Seal Roof PenetrationInstallation Electrical Wiring Wire the Evaporative Cooler optional Install Economizer Sensors optionalInstall Discharge Air Sensor optional Install DDC Interface OptionalInstallation of Gas Piping Install Additional Regulator if RequiredDetermine the Supply Gas Requirements Connect the Supply Gas LineInstallation Evaporative Cooler Piping optional Install the Water Supply LineInstall the Drain Line Check/Adjust Water LevelInstallation of Water WizardTM optional Install Normally Closed Supply Line/ SolenoidInstall Normally Open Drain Line/ Solenoid Water Wizard Valves When provided by manufacturerInstallation of Water Wizard Installation Direct Expansion DX Coil Piping optionalWire the Solenoids Wire the Temperature SensorInstall Suction Line Mount the Remote Sensing Bulb By OthersCheck Coil Piping for Leaks Evacuate and Charge the CoilInstallation of Chilled Water Coil Piping optional Installation of Building Pressure Control optionalStart-Up Blower Set-up Optional Components Reset the Temperature Setting Start-Up Furnaces all unitsStart-Up Single Stage Control Send Unit to High FireStart-Up 21 Staged Control Start-Up 81 Staged ControlSend Unit to Low Fire Check the Low Fire Manifold PressureAccess the Setpoints Menu Access the Discharge Air Temperature SettingEdit the Setting Access the Inlet Air Sensor SettingAccess the Room Override Setting High Fire Adjustment Start-Up 21 Electronic ModulationStart-Up 41 Electronic Modulation Exit High Fire ModeCheck the Low Fire Manifold Pressures Access the Setpoints Menu Verify Sensor Installation Start-Up Economizer optionalSet Minimum Outside Air Set the Enthalpy Changeover Set Point optionalStart-Up Evaporative Cooling optional Start-Up Water Wizard optional Operation - Water Wizard optional Check Operation VAV Units optional External Signal a variableBuilding Pressure Control Check Operation Recirculating Units optional Recirculation OperationBuilding Pressure Control a Damper actuator may take a fewSequence of Operation Staged Sequence Exhaust Fan Contact S1 Manually Closed optionalSequence of Operation 21 Modulation Sequence Discharge Air Temperature dtS Outside Air Temperature OAtSequence of Operation Modulation Sequence Operation Modulation Staged ControllerSequence of Operation 41 Electronic Modulation Program Revision NumberOptional Room Override ROt Light Off BlinkingSequence of Operation Electronic Modulation Sequence of Operation Staged Control Staging Control Sequence of OperationOperation and Errors Ignition Controller Following are the green LED codes of operationOption EC-1 Outside Air Temperature Reference Option EC-3 Differential Temperature ControlOperation Economizer Option EC-2 Outside Air Enthalpy ReferenceTroubleshooting Blower Does Not OperateMotor Over Amps Insufficient Airflow Too Much AirflowExcessive Noise or Vibration Single or 21 Stage Furnace Will Not Light Improper manifold pressureModulating Furnace Will Not Light Heat transformer TR2 fault Ignition controllers IC# failed Staged Furnace Will Not Light Internal high limit tripped temperature above set point Evaporative Cooler does not Operate Recirculating pump Water Blows through Evaporative CoolerAdjust the On Time Factor Adjust the Manual Supply ValveWater Wizard Improper Water Supply Maintenance Routine Belt DrivesSnow Accumulation WheelsMotors FiltersChilled Water Coils Evaporative CoolersMaintenance Fall Flushing Coils Reference Model IG Venting Connection Location Reference Model IGX Venting Connection LocationReference Model IG Single or 2 Stage Reference Model IG Staged Reference Model IG Modulation Modulating Reference Model IGX Blower Control Center Manifold Gas Pressure Test Port Staged Inch Gas Supply Manifold Gas Pressure Test Port Modulating Staged Reference Performance Table Performance TableReference Start-Up Checklist Start-Up ChecklistMaintenance Log Warranty