Greenheck Fan 470656 manual Installation of Water WizardTM optional

Page 19
6 in. min.
Drain
Trap
6 in. min.

1. Install the Water Supply Line

Supply line opening requirements vary by unit size and arrangement and are field-supplied. Connect the water supply line to the float valve through the supply line opening in the evaporative cooling unit. Install the 1/2 inch normally closed solenoid (Valve A) in the supply line. Install the 1/4 inch normally open solenoid (Valve B) between the supply line and the drain line as shown.

2. Install the Drain Line

Connect an unobstructed drain line to the sump drain overflow connection. Install the 3/4 in. normally open solenoid (Valve C) between the sump drain connection and the drain line. A

trap should be used to prevent sewer gas from

being drawn into the unit. Refer to Drain Trap

drawing.

3. Check/Adjust Water Level

Check the water level in the sump tank. The water level should be above the pump intake and below the overflow. Adjust the float as needed to achieve the proper water level.

®

Installation of Water WizardTM (optional)

Evaporative Cooling with the Water Wizard™

Note

The following instructions are provided for evaporative coolers equipped with the Water Wizard™ only. Additional instructions are provided for evaporative coolers equipped with the auto drain and fill or bleed-off.

Warning

Disconnect and lock-out all power and gas before performing any maintenance or service to the unit. Failure to do so could result in serious injury or death and damage to equipment.

Water Wizard™ Valves

(when provided by manufacturer)

Unit

Assembly

Mfg.

ASCO™

Solenoid

De-Energized

Diameter

Qty.

Model

Number

Part

Part

Type

Position

Number

Number

 

 

 

 

 

 

 

 

 

 

IGX -

 

461262

8210G2

Supply

Closed

1/2 inch

1

 

(12.7 mm)

 

 

 

 

 

 

H12/H22

852370

 

 

 

 

 

 

 

 

Supply

 

 

 

IGX - H32

 

 

 

1/2 inch

 

 

383086

8210G34

Line

Open

1

(<9000 cfm)

 

(12.7 mm)

 

 

 

 

Drain

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

383088

8210G9

Supply

Closed

3/4 inch

1

 

 

(19.05 mm)

IGX - H32

 

 

 

 

 

 

852371

 

 

 

 

 

 

 

 

Supply

 

 

 

(≥9000 cfm)

 

 

 

1/2 inch

 

 

 

383086

8210G34

Line

Open

1

 

 

(12.7 mm)

 

 

 

 

Drain

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Part numbers subject to change.

1.Install Normally Closed Supply Line/ Solenoid

Connect the water supply line to the manual supply valve in the unit. Install the supply solenoid in the supply line, upstream of the manual supply valve and below the roofline.

2.Install Normally Open Drain Line/ Solenoid

Connect the drain line to the supply line between the manual supply valve and the supply solenoid. Install a drain solenoid in the drain line, below the roof line. A trap should be installed in the drain line.

Note

Solenoid(s) may be provided by manufacturer (if ordered) or by others.

Caution

Any wiring deviations may result in personal injury or property damage. Manufacturer is not responsible for any damage to or failure of the unit caused by incorrect final wiring.

Model IG / IGX Make-Up Air 19

Image 19
Contents General Safety Information Installation, Operation and Maintenance ManualStorage Inspection and Maintenance during StorageReceiving HandlingClearance to Combustibles / Service Clearances Table of ContentsInstallation of Arrangement DB / HZ Installation of Indoor UnitAssemble and Attach Weatherhood Installation of Roof Mounted Unit Arrangement DBCInstall Combination Curb Adaptor Install Curb/Equipment SupportsInstall Exhaust Options Install Exhaust FanInstall Supply Unit Installation of Venting for Outdoor Units Installation of Evaporative Cooling Module optionalSeparated Combustion Concentric Venting Installation of Venting for Indoor UnitsVenting Methods Standard Indoor VentingInstalling Exhaust Vent Pipe Installation of Standard Indoor VentingVent Pipe Diameter Concentric Venting Horizontal Installation of Concentric Venting GeneralConcentric Venting Vertical Intake END Seal Wall Openings Installation of Two Pipe Venting HorizontalSeal Roof Penetration Installation of Two Pipe Venting VerticalInstallation Electrical Wiring Install DDC Interface Optional Wire the Evaporative Cooler optionalInstall Economizer Sensors optional Install Discharge Air Sensor optionalConnect the Supply Gas Line Installation of Gas PipingInstall Additional Regulator if Required Determine the Supply Gas RequirementsCheck/Adjust Water Level Installation Evaporative Cooler Piping optionalInstall the Water Supply Line Install the Drain LineWater Wizard Valves When provided by manufacturer Installation of Water WizardTM optionalInstall Normally Closed Supply Line/ Solenoid Install Normally Open Drain Line/ SolenoidWire the Temperature Sensor Installation of Water WizardInstallation Direct Expansion DX Coil Piping optional Wire the SolenoidsEvacuate and Charge the Coil Install Suction LineMount the Remote Sensing Bulb By Others Check Coil Piping for LeaksInstallation of Building Pressure Control optional Installation of Chilled Water Coil Piping optionalStart-Up Blower Set-up Optional Components Send Unit to High Fire Reset the Temperature SettingStart-Up Furnaces all units Start-Up Single Stage ControlCheck the Low Fire Manifold Pressure Start-Up 21 Staged ControlStart-Up 81 Staged Control Send Unit to Low FireAccess the Inlet Air Sensor Setting Access the Setpoints MenuAccess the Discharge Air Temperature Setting Edit the SettingAccess the Room Override Setting Start-Up 21 Electronic Modulation High Fire AdjustmentStart-Up 41 Electronic Modulation Exit High Fire ModeCheck the Low Fire Manifold Pressures Access the Setpoints Menu Set the Enthalpy Changeover Set Point optional Verify Sensor InstallationStart-Up Economizer optional Set Minimum Outside AirStart-Up Evaporative Cooling optional Start-Up Water Wizard optional Operation - Water Wizard optional Check Operation VAV Units optional External Signal a variableBuilding Pressure Control Damper actuator may take a few Check Operation Recirculating Units optionalRecirculation Operation Building Pressure Control aExhaust Fan Contact S1 Manually Closed optional Sequence of Operation Staged SequenceSequence of Operation 21 Modulation Sequence Operation Modulation Staged Controller Discharge Air Temperature dtSOutside Air Temperature OAt Sequence of Operation Modulation SequenceLight Off Blinking Sequence of Operation 41 Electronic ModulationProgram Revision Number Optional Room Override ROtSequence of Operation Electronic Modulation Staging Control Sequence of Operation Sequence of Operation Staged ControlFollowing are the green LED codes of operation Operation and Errors Ignition ControllerOption EC-2 Outside Air Enthalpy Reference Option EC-1 Outside Air Temperature ReferenceOption EC-3 Differential Temperature Control Operation EconomizerBlower Does Not Operate TroubleshootingMotor Over Amps Too Much Airflow Insufficient AirflowExcessive Noise or Vibration Improper manifold pressure Single or 21 Stage Furnace Will Not LightModulating Furnace Will Not Light Heat transformer TR2 fault Ignition controllers IC# failed Staged Furnace Will Not Light Internal high limit tripped temperature above set point Water Blows through Evaporative Cooler Evaporative Cooler does not Operate Recirculating pumpAdjust the On Time Factor Adjust the Manual Supply ValveWater Wizard Improper Water Supply Wheels Maintenance RoutineBelt Drives Snow AccumulationEvaporative Coolers MotorsFilters Chilled Water CoilsMaintenance Fall Flushing Coils Reference Model IGX Venting Connection Location Reference Model IG Venting Connection LocationReference Model IG Single or 2 Stage Reference Model IG Staged Reference Model IG Modulation Modulating Reference Model IGX Blower Control Center Manifold Gas Pressure Test Port Staged Inch Gas Supply Manifold Gas Pressure Test Port Modulating Staged Performance Table Reference Performance TableStart-Up Checklist Reference Start-Up ChecklistWarranty Maintenance Log