Greenheck Fan 470656 manual Installation, Operation and Maintenance Manual

Page 1

Part #470656

IG/IGX Make-Up Air Unit

®

Installation, Operation and Maintenance Manual

Please read and save these instructions. Read carefully before attempting to assemble, install, operate or maintain the product described. Protect yourself and others by observing all safety information. Failure to comply with instructions could result in personal injury and/or property damage! Retain instructions for future reference.

General Safety Information

Only qualified personnel should install this unit. Personnel should have a clear understanding of these instructions and should be aware of general safety precautions. Improper installation can result in electric shock, possible injury due to coming in contact with moving parts, as well as other potential hazards. Other considerations may be required if high winds or seismic activity are present. If more information

is needed, contact a licensed professional engineer before moving forward.

1.Follow all local electrical and safety codes, as well as the National Electrical Code (NEC), the National Fire Protection Agency (NFPA), where applicable.

Follow the Canadian Electrical Code (CEC) in Canada.

2.The rotation of the wheel is critical. It must be free to rotate without striking or rubbing any stationary objects.

3.Motor must be securely and adequately grounded.

4.Do not spin fan wheel faster than the maximum cataloged fan rpm. Adjustments to fan speed significantly affects motor load. If the fan RPM is changed, the motor current should be checked to make sure it is not exceeding the motor nameplate amps.

5.Do not allow the power cable to kink or come in contact with oil, grease, hot surfaces, or chemicals. Replace cord immediately if damaged.

6.Verify that the power source is compatible with the equipment.

7.Never open blower access doors while the fan is running.

DANGER

Always disconnect power before working on or near a unit. Lock and tag the disconnect switch or breaker to prevent accidental power up.

CAUTION

When servicing the unit, motor may be hot enough to cause pain or injury. Allow motor to cool before servicing.

FOR YOUR SAFETY

If you smell gas:

1.Open windows.

2.Do not touch electrical switches.

3.Extinguish any open flame.

4.Immediately call your gas supplier.

FOR YOUR SAFETY

The use and storage of gasoline or other flammable vapors and liquids in open containers in the vicinity of this appliance is hazardous.

WARNING

Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death. Read the installation, operating and maintenance instructions thoroughly before installing or servicing this equipment.

®

Model IG / IGX Make-Up Air 1

Image 1
Contents General Safety Information Installation, Operation and Maintenance ManualReceiving Inspection and Maintenance during StorageHandling StorageClearance to Combustibles / Service Clearances Table of ContentsInstallation of Arrangement DB / HZ Installation of Indoor UnitInstall Combination Curb Adaptor Installation of Roof Mounted Unit Arrangement DBCInstall Curb/Equipment Supports Assemble and Attach WeatherhoodInstall Exhaust Options Install Exhaust FanInstall Supply Unit Installation of Venting for Outdoor Units Installation of Evaporative Cooling Module optionalVenting Methods Installation of Venting for Indoor UnitsStandard Indoor Venting Separated Combustion Concentric VentingInstalling Exhaust Vent Pipe Installation of Standard Indoor VentingVent Pipe Diameter Concentric Venting Horizontal Installation of Concentric Venting GeneralConcentric Venting Vertical Intake END Seal Wall Openings Installation of Two Pipe Venting HorizontalSeal Roof Penetration Installation of Two Pipe Venting VerticalInstallation Electrical Wiring Install Economizer Sensors optional Wire the Evaporative Cooler optionalInstall Discharge Air Sensor optional Install DDC Interface OptionalInstall Additional Regulator if Required Installation of Gas PipingDetermine the Supply Gas Requirements Connect the Supply Gas LineInstall the Water Supply Line Installation Evaporative Cooler Piping optionalInstall the Drain Line Check/Adjust Water LevelInstall Normally Closed Supply Line/ Solenoid Installation of Water WizardTM optionalInstall Normally Open Drain Line/ Solenoid Water Wizard Valves When provided by manufacturerInstallation Direct Expansion DX Coil Piping optional Installation of Water WizardWire the Solenoids Wire the Temperature SensorMount the Remote Sensing Bulb By Others Install Suction LineCheck Coil Piping for Leaks Evacuate and Charge the CoilInstallation of Building Pressure Control optional Installation of Chilled Water Coil Piping optionalStart-Up Blower Set-up Optional Components Start-Up Furnaces all units Reset the Temperature SettingStart-Up Single Stage Control Send Unit to High FireStart-Up 81 Staged Control Start-Up 21 Staged ControlSend Unit to Low Fire Check the Low Fire Manifold PressureAccess the Discharge Air Temperature Setting Access the Setpoints MenuEdit the Setting Access the Inlet Air Sensor SettingAccess the Room Override Setting Start-Up 21 Electronic Modulation High Fire AdjustmentStart-Up 41 Electronic Modulation Exit High Fire ModeCheck the Low Fire Manifold Pressures Access the Setpoints Menu Start-Up Economizer optional Verify Sensor InstallationSet Minimum Outside Air Set the Enthalpy Changeover Set Point optionalStart-Up Evaporative Cooling optional Start-Up Water Wizard optional Operation - Water Wizard optional Check Operation VAV Units optional External Signal a variableBuilding Pressure Control Recirculation Operation Check Operation Recirculating Units optionalBuilding Pressure Control a Damper actuator may take a fewExhaust Fan Contact S1 Manually Closed optional Sequence of Operation Staged SequenceSequence of Operation 21 Modulation Sequence Outside Air Temperature OAt Discharge Air Temperature dtSSequence of Operation Modulation Sequence Operation Modulation Staged ControllerProgram Revision Number Sequence of Operation 41 Electronic ModulationOptional Room Override ROt Light Off BlinkingSequence of Operation Electronic Modulation Staging Control Sequence of Operation Sequence of Operation Staged ControlFollowing are the green LED codes of operation Operation and Errors Ignition ControllerOption EC-3 Differential Temperature Control Option EC-1 Outside Air Temperature ReferenceOperation Economizer Option EC-2 Outside Air Enthalpy ReferenceBlower Does Not Operate TroubleshootingMotor Over Amps Too Much Airflow Insufficient AirflowExcessive Noise or Vibration Improper manifold pressure Single or 21 Stage Furnace Will Not LightModulating Furnace Will Not Light Heat transformer TR2 fault Ignition controllers IC# failed Staged Furnace Will Not Light Internal high limit tripped temperature above set point Water Blows through Evaporative Cooler Evaporative Cooler does not Operate Recirculating pumpAdjust the On Time Factor Adjust the Manual Supply ValveWater Wizard Improper Water Supply Belt Drives Maintenance RoutineSnow Accumulation WheelsFilters MotorsChilled Water Coils Evaporative CoolersMaintenance Fall Flushing Coils Reference Model IGX Venting Connection Location Reference Model IG Venting Connection LocationReference Model IG Single or 2 Stage Reference Model IG Staged Reference Model IG Modulation Modulating Reference Model IGX Blower Control Center Manifold Gas Pressure Test Port Staged Inch Gas Supply Manifold Gas Pressure Test Port Modulating Staged Performance Table Reference Performance TableStart-Up Checklist Reference Start-Up ChecklistWarranty Maintenance Log