State Industries GP650HTPDT, SHE50-100PE, SHE50-100NE Operational States Modes, State Description

Page 32

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

UIM (CONT)

Table 5 - Operational States (Modes)

STATE

DESCRIPTION

 

 

 

The water heater is not in an active heating cycle. This usually means the temperature

Standby

in the tank has reached Operating Set Point and has not dropped low enough to initiate

 

a call for heat.

 

 

 

The control system is waiting for specific conditions to occur (primarily pressure switch

Input Verification

normal state verification - see page 20) before the unit can continue in the Sequence of

 

Operation.

 

The blower has been energized - the control system is purging out any excess gas or

Pre-Purge

left over products of combustion from the heat exchanger at the beginning of each

 

heating cycle.

 

 

Igniter Warmup

The igniter has been energized and is currently warming up to ensure proper ignition -

typically last 17-20 seconds.

 

 

 

Ignition Activation

The control system is allowing for a steady burner flame to be established. Duration of

this and the Ignition Verification state is typically 4-6 seconds.

 

Ignition Verification

Assurance of proper flame sense is being determined.

Inter-Purge

After a failed trial for ignition the control system is purging out any excess gas or left

over products of combustion from the heat exchanger before another trail for ignition.

 

 

 

Heating

Burner flame has been properly established - minimum flame sensing current has

been verified by the control system - water in the tank is being heated.

 

Post-Purge

The control system is purging out any excess gas or left over products of combustion

from the heat exchanger after a successful heating cycle.

 

 

 

 

The control system has detected a fault and declared a fault condition. The control

Fault

system is locked out. A fault message is displayed on the UIM (page 27). The problem

that caused the lock out must be corrected before the water heater can resume a

 

 

heating cycle.

 

 

Technical Literature Department

31 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Image 32
Contents Service Handbook Ultra High Efficiency Power VENT/POWER Direct Vent Important Service Reminder Qualifications Qualified Service AgentService Warning Tools Required Closed Water Systems Thermal ExpansionAIR Requirements Contaminated AIRVenting Maximum Equivalent Length RequirementsService Notes Venting Pipe Size RequirementsMaximum Elbow Requirements Number Maximum Pipe Elbows Length Feet MetersService Notes Electrical VAC 1Ø Power SupplyCorrectly Wired Outlet Electrical RequirementsHOW IT Works Internal ViewService Notes Blower BlowerService Notes Burner Flame Sensor BurnerBurner & Blower Removal On NextService Notes Blower Flange & Blower Adapter Gaskets Burner/Blower RemovalVenturi BlowerGasket Orifice GAS ValveGas Valve Removal GAS Pressure Testing Service Notes Checking Gas PressuresGas Pressures Service Notes Gas Pressure AdjustmentGAS Pressures AIR Pressure Switches Normal State Activated StateBlocked Exhaust Switch Blower Prover SwitchBlocked Intake Switch AIR Pressure Switch Operation Blower Prover FailureOperational State Test AIR Pressure Switch TestingNormal State Test Blower Prover Blocked Intake Blocked Exhaust Air Pressure Switch ParametersPressure Test Page Flame Sensor Flame Sensing TestMeasuring Flame Sensing Current Service Notes Hot Surface Igniters Igniter Current TestControl System Features IntroductionService Notes Button Pad Ribbon Cable UIMCommercial & Residential Product Differences Discreet Menu Contact InformationService Note Sequence of Operation Display Desktop ScreenStatus Icons Status Icon DescriptionOperational States Modes State DescriptionOperating SET Point Adjustment Action DisplayControl System Menus ECO Service Notes CCB Replacement CCBJ10 J13 J15 J11 J16 Socket IdentificationJ3 Socket 120 VAC Power Supply J1 Socket TransformerJ2 Socket 120 VAC To Blower PIN # DescriptionRetry Ext Use Yes Input Type Tstat OpenWiring Diagram Service Notes Polarity & GroundSequence of Operation YESResetting the control system Important Service ReminderRough Starting Rough Operation Note Heater Status MenuControl System Unresponsive UIM Display Is BlankUIM is Inoperable Displayed Message CHECK/REPAIR CONDITION/INDICATESFault Messages AC ReversedFlame Probe Short Upper Probe ShortFlame Detect Error Energy Cut Out ECOBlocked Inlet Blocked Exhaust Vent Turned on and a Call for Heat Active Perform ALL These Tests with PowerBlower Prover Open Low Igniter Current Ignition Failure Rough Starting Rough Operation NoteCheck for 24 VAC to the Gas Valve solenoid coil Gas Valve Failure Communication FailureTennessee Waltz Parkway Ashland City, TN