State Industries SHE50-100NE, SHE50-100PE Blower Prover Open, Perform ALL These Tests with Power

Page 49

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

FAULT MESSAGES (CONT)

DISPLAYED MESSAGE

CHECK/REPAIR

CONDITION/INDICATES

 

 

 

“Blower Prover Open”

PERFORM ALL THESE TESTS WITH POWER

(Blower Not Running)

TURNED ON AND A CALL FOR HEAT ACTIVE.

The control system has detected open contacts at

• Check for 120 VAC at the CCB’s J2 Socket

(page 36) pins 1 & 2. Perform close visual

the Blower Prover air pressure switch after Blower

inspection of the pins inside the plug and socket

has been energized.

- ensure plugs and sockets are mating properly

 

and providing good contact.

 

• Check all wiring between CCB’s J2 Socket pins

 

1 & 2 and the blower motor assembly’s high

 

voltage 3 Pin Socket (see page 10).

 

• Disconnect the plug at the blower motor assem-

 

bly’s high voltage 3 Pin Socket - check for 120

 

VAC at the plug end.

 

• Perform close visual inspection of the pins

 

inside the plug and socket at the blower motor

 

assembly’s high voltage 3 Pin Socket - ensure

 

plugs and sockets are mating properly and pro-

 

viding good contact.

 

• Disconnect the plug at the blower assembly’s

 

Low Voltage PWM 5 pin plug (see page 10). If

 

the Blower has not been running prior and starts

 

running when this plug is disconnected - call the

 

technical support phone number shown on the

 

water heater labeling for further assistance.

 

 

“Blower Prover Open”

• Ensure the Blower Prover air pressure switch

(Blower Is Running)

sensing tube is connected properly at both ends

The control system has detected open contacts at

and that it is not kinked or damaged. Repair/

the Blower Prover air pressure switch after Blower

replace anything worn or damaged as neces-

has been energized.

sary.

 

• Check all wiring between CCB’s J6 Socket

 

(page 35) pins 6 & 7 and the Blower Prover air

 

pressure switch. Repair/replace anything worn

 

or damaged as necessary.

 

• Perform close visual inspection of the pins

 

inside the CCB J6 plug and socket - ensure

 

plugs and sockets are mating properly and pro-

 

viding good contact.

 

• Review the air pressure switch information

 

beginning on page 18. Perform the pressure

 

switch test procedure for the Blower Prover air

 

pressure switch - see pages 21 through 23.

 

Replace the Blower Prover switch if defective.

 

 

Technical Literature Department

48 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Image 49
Contents Service Handbook Ultra High Efficiency Power VENT/POWER Direct Vent Service Warning Qualifications Qualified Service AgentImportant Service Reminder Tools Required Thermal Expansion Closed Water SystemsContaminated AIR AIR RequirementsMaximum Equivalent Length Requirements VentingPipe Size Requirements Service Notes VentingMaximum Elbow Requirements Number Maximum Pipe Elbows Length Feet MetersVAC 1Ø Power Supply Service Notes ElectricalCorrectly Wired Outlet Electrical RequirementsInternal View HOW IT WorksBlower Service Notes BlowerBurner Service Notes Burner Flame SensorOn Next Burner & Blower RemovalBurner/Blower Removal Service Notes Blower Flange & Blower Adapter GasketsBlower VenturiGas Valve Removal GAS ValveGasket Orifice Service Notes Checking Gas Pressures GAS Pressure TestingGAS Pressures Service Notes Gas Pressure AdjustmentGas Pressures Normal State Activated State AIR Pressure SwitchesBlocked Intake Switch Blower Prover SwitchBlocked Exhaust Switch Blower Prover Failure AIR Pressure Switch OperationNormal State Test AIR Pressure Switch TestingOperational State Test Pressure Test Air Pressure Switch ParametersBlower Prover Blocked Intake Blocked Exhaust Page Measuring Flame Sensing Current Flame Sensing TestFlame Sensor Igniter Current Test Service Notes Hot Surface IgnitersIntroduction Control System FeaturesUIM Service Notes Button Pad Ribbon CableDiscreet Menu Contact Information Commercial & Residential Product DifferencesDesktop Screen Service Note Sequence of Operation DisplayStatus Icon Description Status IconsState Description Operational States ModesAction Display Operating SET Point AdjustmentControl System Menus ECO CCB Service Notes CCB ReplacementSocket Identification J10 J13 J15 J11 J16J1 Socket Transformer J3 Socket 120 VAC Power SupplyJ2 Socket 120 VAC To Blower PIN # DescriptionExt Use Yes Input Type Tstat Open RetryService Notes Polarity & Ground Wiring DiagramYES Sequence of OperationImportant Service Reminder Resetting the control systemRough Starting Rough Operation Note Heater Status MenuUIM Display Is Blank Control System UnresponsiveUIM is Inoperable Displayed Message CHECK/REPAIR CONDITION/INDICATESAC Reversed Fault MessagesUpper Probe Short Flame Probe ShortEnergy Cut Out ECO Flame Detect ErrorBlocked Inlet Blocked Exhaust Vent Blower Prover Open Perform ALL These Tests with PowerTurned on and a Call for Heat Active Low Igniter Current Rough Starting Rough Operation Note Ignition FailureCheck for 24 VAC to the Gas Valve solenoid coil Communication Failure Gas Valve FailureTennessee Waltz Parkway Ashland City, TN