State Industries GP650HTPDT, SHE50-100PE, SHE50-100NE manual Fault Messages, AC Reversed

Page 44

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

FAULT MESSAGES

DISPLAYED MESSAGE

CHECK/REPAIR

CONDITION/INDICATES

 

 

 

“AC Reversed”

• Check incoming power supply wiring to the

 

water heater in the junction box - ensure that

The control system has detected the power supply

the hot wire is connected to the water heater’s

black wire and the neutral wire is connected to

polarity is reversed.

the water heater’s white wire inside the junction

 

 

box. See electrical requirements on page 8.

 

• Check for 120 VAC at CCB’s J3 Socket (page

 

36) pins 1 & 3 with J3 plug inserted, power on.

 

Check for AC voltage between pin 1 and ground

 

- should indicate 120 VAC.

 

Check for AC voltage between pin 3 and ground

 

- should indicate 0 VAC.

 

• Call the technical support phone number shown

 

on the water heater labeling for further assis-

 

tance if the problem has not been corrected

 

after performing the procedures outlined here.

 

 

“Upper Probe Open”

• Check Temperature Probe plug and socket con-

 

nection at CCB’s J7 Socket (page 36). Perform

The control system has detected over 56,000 ohms

close visual inspection of the pins inside the

plug and socket - ensure plugs and sockets are

from the Temperature Probe on top of the water

mating properly and providing good contact.

heater.

• Check all wiring between the Temperature

 

 

Probe and the J7 Socket on the CCB. Repair/

 

replace anything worn or damaged.

 

• Unplug J7 plug from CCB, check resistance

 

between the two black wires in the plug end with

 

an ohm meter. If resistance is above 56,000

 

ohms - replace the Temperature Probe.

 

• Call the technical support phone number shown

 

on the water heater labeling for further assis-

 

tance if the problem has not been corrected

 

after performing the procedures outlined here.

 

 

Technical Literature Department

43 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Image 44
Contents Service Handbook Ultra High Efficiency Power VENT/POWER Direct Vent Important Service Reminder Qualifications Qualified Service AgentService Warning Tools Required Closed Water Systems Thermal ExpansionAIR Requirements Contaminated AIRVenting Maximum Equivalent Length RequirementsService Notes Venting Pipe Size RequirementsMaximum Elbow Requirements Number Maximum Pipe Elbows Length Feet MetersService Notes Electrical VAC 1Ø Power SupplyCorrectly Wired Outlet Electrical RequirementsHOW IT Works Internal ViewService Notes Blower BlowerService Notes Burner Flame Sensor BurnerBurner & Blower Removal On NextService Notes Blower Flange & Blower Adapter Gaskets Burner/Blower RemovalVenturi BlowerGasket Orifice GAS ValveGas Valve Removal GAS Pressure Testing Service Notes Checking Gas PressuresGas Pressures Service Notes Gas Pressure AdjustmentGAS Pressures AIR Pressure Switches Normal State Activated StateBlocked Exhaust Switch Blower Prover SwitchBlocked Intake Switch AIR Pressure Switch Operation Blower Prover FailureOperational State Test AIR Pressure Switch TestingNormal State Test Blower Prover Blocked Intake Blocked Exhaust Air Pressure Switch ParametersPressure Test Page Flame Sensor Flame Sensing TestMeasuring Flame Sensing Current Service Notes Hot Surface Igniters Igniter Current TestControl System Features IntroductionService Notes Button Pad Ribbon Cable UIMCommercial & Residential Product Differences Discreet Menu Contact InformationService Note Sequence of Operation Display Desktop ScreenStatus Icons Status Icon DescriptionOperational States Modes State DescriptionOperating SET Point Adjustment Action DisplayControl System Menus ECO Service Notes CCB Replacement CCBJ10 J13 J15 J11 J16 Socket IdentificationJ3 Socket 120 VAC Power Supply J1 Socket TransformerJ2 Socket 120 VAC To Blower PIN # DescriptionRetry Ext Use Yes Input Type Tstat OpenWiring Diagram Service Notes Polarity & GroundSequence of Operation YESResetting the control system Important Service ReminderRough Starting Rough Operation Note Heater Status MenuControl System Unresponsive UIM Display Is BlankUIM is Inoperable Displayed Message CHECK/REPAIR CONDITION/INDICATESFault Messages AC ReversedFlame Probe Short Upper Probe ShortFlame Detect Error Energy Cut Out ECOBlocked Inlet Blocked Exhaust Vent Turned on and a Call for Heat Active Perform ALL These Tests with PowerBlower Prover Open Low Igniter Current Ignition Failure Rough Starting Rough Operation NoteCheck for 24 VAC to the Gas Valve solenoid coil Gas Valve Failure Communication FailureTennessee Waltz Parkway Ashland City, TN