State Industries SHE50-100NE, SHE50-100PE, GP650HTPDT Uim, Service Notes Button Pad Ribbon Cable

Page 28

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

UIM

The UIM (User Interface Module) is the display on the front of the water heater. The UIM’s major components include a Circuit Board with LCD display and a Button Pad Overlay which contains the five user input buttons.

Service Notes - Button Pad Ribbon Cable

The Ribbon Cable that connects the Button Pad Overlay to the UIM Circuit Board must be plugged in exactly as shown in the images below; with the metal crimp connections visible on the plug end and the UIM Circuit Board back facing out. There are six pins on this Ribbon cable socket, Ensure all six pins are inserted into the Ribbon Cable plug whenever removing or installing the UIM or Button Pad Overlay.

Failure to connect this Ribbon cable exactly as shown when servicing will render the User Input Buttons inoperable. This should be checked whenever the nature of the service complaint is an inoperable or unresponsive controller or UIM.

Button Pad Overlay

Ensure Ribbon Cable Plug is inserted exactly as shown.

UIM Circuit Board Back

J2 Socket - CCB

J3 Socket - Button Pad

Communication

Communication

Ribbon Cable To

Button Pad

 

LCD

UIM Circuit Board Front

Screen

 

Technical Literature Department

27 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Image 28
Contents Service Handbook Ultra High Efficiency Power VENT/POWER Direct Vent Service Warning Qualifications Qualified Service AgentImportant Service Reminder Tools Required Closed Water Systems Thermal ExpansionAIR Requirements Contaminated AIRVenting Maximum Equivalent Length RequirementsService Notes Venting Pipe Size RequirementsMaximum Elbow Requirements Number Maximum Pipe Elbows Length Feet MetersService Notes Electrical VAC 1Ø Power SupplyCorrectly Wired Outlet Electrical RequirementsHOW IT Works Internal ViewService Notes Blower BlowerService Notes Burner Flame Sensor BurnerBurner & Blower Removal On NextService Notes Blower Flange & Blower Adapter Gaskets Burner/Blower RemovalVenturi BlowerGas Valve Removal GAS ValveGasket Orifice GAS Pressure Testing Service Notes Checking Gas PressuresGAS Pressures Service Notes Gas Pressure AdjustmentGas Pressures AIR Pressure Switches Normal State Activated StateBlocked Intake Switch Blower Prover SwitchBlocked Exhaust Switch AIR Pressure Switch Operation Blower Prover FailureNormal State Test AIR Pressure Switch TestingOperational State Test Pressure Test Air Pressure Switch ParametersBlower Prover Blocked Intake Blocked Exhaust Page Measuring Flame Sensing Current Flame Sensing TestFlame Sensor Service Notes Hot Surface Igniters Igniter Current TestControl System Features IntroductionService Notes Button Pad Ribbon Cable UIMCommercial & Residential Product Differences Discreet Menu Contact InformationService Note Sequence of Operation Display Desktop ScreenStatus Icons Status Icon DescriptionOperational States Modes State DescriptionOperating SET Point Adjustment Action DisplayControl System Menus ECO Service Notes CCB Replacement CCBJ10 J13 J15 J11 J16 Socket IdentificationJ3 Socket 120 VAC Power Supply J1 Socket TransformerJ2 Socket 120 VAC To Blower PIN # DescriptionRetry Ext Use Yes Input Type Tstat OpenWiring Diagram Service Notes Polarity & GroundSequence of Operation YESResetting the control system Important Service ReminderRough Starting Rough Operation Note Heater Status MenuControl System Unresponsive UIM Display Is BlankUIM is Inoperable Displayed Message CHECK/REPAIR CONDITION/INDICATESFault Messages AC ReversedFlame Probe Short Upper Probe ShortFlame Detect Error Energy Cut Out ECOBlocked Inlet Blocked Exhaust Vent Blower Prover Open Perform ALL These Tests with PowerTurned on and a Call for Heat Active Low Igniter Current Ignition Failure Rough Starting Rough Operation NoteCheck for 24 VAC to the Gas Valve solenoid coil Gas Valve Failure Communication FailureTennessee Waltz Parkway Ashland City, TN