State Industries GP650HTPDT, SHE50-100PE manual Ultra High Efficiency Power VENT/POWER Direct Vent

Page 2

ULTRA HIGH EFFICIENCY

POWER VENT/POWER DIRECT VENT

SERVICE MANUAL

Technical Literature Department ©2008

TABLE OF CONTENTS

INTRODUCTION

2

Qualifications

2

Service Warning

2

Important Service Reminder

2

Instruction Manual

3

Tools Required

3

INSTALLATION CONSIDERATIONS

4

Closed Water Systems

4

Thermal Expansion

4

Air Requirements

5

Contaminated Air

5

Venting

6

Electrical Requirements

8

OPERATION & SERVICE

9

How it works

9

Blower

10

Burner

11

Venturi

14

Gas Valve

15

Gas Pressure Testing

16

Air Pressure Switches

18

Air Pressure Switch Operation

20

Air Pressure Switch Testing

21

Flame Sensing Test

24

Igniter Current Test

25

CONTROL SYSTEM

26

Introduction

26

UIM

27

Discreet Menu - Contact Information

28

Operating Set Point Adjustment

32

Control System Menus

33

CCB

35

Socket Identification

36

Wiring Diagram

39

Sequence of Operation

40

TROUBLESHOOTING

41

Rough Start - Rough Operation

13 and 41

Heater Status Menu

33

Things to Check Before Servicing

41

Reset Procedure

41

Control System Unresponsive

42

Blank Display

42

UIM Inoperable

42

Fault Messages

43

AC Reversed

43

Upper Probe Open

43

Upper Probe Short

44

Flame Probe Short

44

Flame Detect Error

45

Energy Cut Out (ECO)

45

Blocked Inlet

46

Blocked Exhaust Vent

47

Blower Prover Failure

47

Blower Prover Open - Blower Not Running

48

Blower Prover Open - Blower Is Running

48

Low Igniter Current

49

Ignition Failure

50

Gas Valve Failure

52

Communication Failure

52

Image 2
Contents Service Handbook Ultra High Efficiency Power VENT/POWER Direct Vent Important Service Reminder Qualifications Qualified Service AgentService Warning Tools Required Closed Water Systems Thermal ExpansionAIR Requirements Contaminated AIRVenting Maximum Equivalent Length RequirementsMaximum Elbow Requirements Service Notes VentingPipe Size Requirements Number Maximum Pipe Elbows Length Feet MetersCorrectly Wired Outlet Service Notes ElectricalVAC 1Ø Power Supply Electrical RequirementsHOW IT Works Internal ViewService Notes Blower BlowerService Notes Burner Flame Sensor BurnerBurner & Blower Removal On NextService Notes Blower Flange & Blower Adapter Gaskets Burner/Blower RemovalVenturi BlowerGasket Orifice GAS ValveGas Valve Removal GAS Pressure Testing Service Notes Checking Gas PressuresGas Pressures Service Notes Gas Pressure AdjustmentGAS Pressures AIR Pressure Switches Normal State Activated StateBlocked Exhaust Switch Blower Prover SwitchBlocked Intake Switch AIR Pressure Switch Operation Blower Prover FailureOperational State Test AIR Pressure Switch TestingNormal State Test Blower Prover Blocked Intake Blocked Exhaust Air Pressure Switch ParametersPressure Test Page Flame Sensor Flame Sensing TestMeasuring Flame Sensing Current Service Notes Hot Surface Igniters Igniter Current TestControl System Features IntroductionService Notes Button Pad Ribbon Cable UIMCommercial & Residential Product Differences Discreet Menu Contact InformationService Note Sequence of Operation Display Desktop ScreenStatus Icons Status Icon DescriptionOperational States Modes State DescriptionOperating SET Point Adjustment Action DisplayControl System Menus ECO Service Notes CCB Replacement CCBJ10 J13 J15 J11 J16 Socket IdentificationJ2 Socket 120 VAC To Blower J3 Socket 120 VAC Power SupplyJ1 Socket Transformer PIN # DescriptionRetry Ext Use Yes Input Type Tstat OpenWiring Diagram Service Notes Polarity & GroundSequence of Operation YESRough Starting Rough Operation Note Resetting the control systemImportant Service Reminder Heater Status MenuUIM is Inoperable Control System UnresponsiveUIM Display Is Blank Displayed Message CHECK/REPAIR CONDITION/INDICATESFault Messages AC ReversedFlame Probe Short Upper Probe ShortFlame Detect Error Energy Cut Out ECOBlocked Inlet Blocked Exhaust Vent Turned on and a Call for Heat Active Perform ALL These Tests with PowerBlower Prover Open Low Igniter Current Ignition Failure Rough Starting Rough Operation NoteCheck for 24 VAC to the Gas Valve solenoid coil Gas Valve Failure Communication FailureTennessee Waltz Parkway Ashland City, TN