State Industries SHE50-100PE, SHE50-100NE, GP650HTPDT Retry, Ext Use Yes Input Type Tstat Open

Page 39

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

CCB (CONT)

J7 Socket - Temperature Probe/ECO (immersion probe - top of the water heater)

PIN #

DESCRIPTION

1ECO (energy cut out) 24 VAC out (red wire)

2Upper temperature probe (thermistor) +5.0 VDC (black wire)

3Upper temperature probe (thermistor) -5.0 VDC (black wire)

4ECO (energy cut out) 24 VAC return (red wire)

J9 Port - Communication Port - Not Used

 

J10

Socket - Not Used

 

J11 Port - Communication Port - Not Used

 

J13

Socket - Blower Speed Control (VFD)

 

 

 

 

 

 

 

PIN #

DESCRIPTION

1Not used

2Not used

3To Blower low voltage PWM plug (see page 10) - pin #5 (white w/grn stripe)

4Not used

5Not used

6Not used

7To Blower low voltage PWM plug (see page 10) - pin #4 (white w/blue stripe)

8To Blower low voltage PWM plug (see page 10) - pin #1 (white w/brn stripe)

J15 Socket - Not Used

J16 Port - Communication Port - UIM Display (user interface module) S1 Dip Switch

The S1 dip switches are configured from the factory and should not be changed. The illustration below shows the 4 dip switches with labeling. Dip switches are toggle type micro switches. Flipping a dip switch towards “Open” would be the same as “Off.” Flipping a dip switch the other way (towards the switch numbers) is the same as “On.”

Dip switch #1 is used to configure the water heater to declare a fault condition and lock out after one or three failed trials for ignition. The factory setting is “on” for three trials.

Dip switches #2 and #3 are used when this control system is installed on other products. The factory setting for these two dip switches is “on.”

Dip switch #4 is a spare, configuration does not matter.

OFF

OPEN

 

1 Retry

1

3

 

 

Retries

 

 

 

 

ON

Ext

Use Yes

2 3

No

Input Type Tstat OPEN

Vent

CLOSED

 

Spare

4

Spare

 

 

 

 

Technical Literature Department

38 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Image 39
Contents Service Handbook Ultra High Efficiency Power VENT/POWER Direct Vent Qualifications Qualified Service Agent Service WarningImportant Service Reminder Tools Required Thermal Expansion Closed Water SystemsContaminated AIR AIR RequirementsMaximum Equivalent Length Requirements VentingNumber Maximum Pipe Elbows Length Feet Meters Service Notes VentingPipe Size Requirements Maximum Elbow RequirementsElectrical Requirements Service Notes ElectricalVAC 1Ø Power Supply Correctly Wired OutletInternal View HOW IT WorksBlower Service Notes BlowerBurner Service Notes Burner Flame SensorOn Next Burner & Blower RemovalBurner/Blower Removal Service Notes Blower Flange & Blower Adapter GasketsBlower VenturiGAS Valve Gas Valve RemovalGasket Orifice Service Notes Checking Gas Pressures GAS Pressure TestingService Notes Gas Pressure Adjustment GAS PressuresGas Pressures Normal State Activated State AIR Pressure SwitchesBlower Prover Switch Blocked Intake SwitchBlocked Exhaust Switch Blower Prover Failure AIR Pressure Switch OperationAIR Pressure Switch Testing Normal State TestOperational State Test Air Pressure Switch Parameters Pressure TestBlower Prover Blocked Intake Blocked Exhaust Page Flame Sensing Test Measuring Flame Sensing CurrentFlame Sensor Igniter Current Test Service Notes Hot Surface IgnitersIntroduction Control System FeaturesUIM Service Notes Button Pad Ribbon CableDiscreet Menu Contact Information Commercial & Residential Product DifferencesDesktop Screen Service Note Sequence of Operation DisplayStatus Icon Description Status IconsState Description Operational States ModesAction Display Operating SET Point AdjustmentControl System Menus ECO CCB Service Notes CCB ReplacementSocket Identification J10 J13 J15 J11 J16PIN # Description J3 Socket 120 VAC Power SupplyJ1 Socket Transformer J2 Socket 120 VAC To BlowerExt Use Yes Input Type Tstat Open RetryService Notes Polarity & Ground Wiring DiagramYES Sequence of OperationHeater Status Menu Resetting the control systemImportant Service Reminder Rough Starting Rough Operation NoteDisplayed Message CHECK/REPAIR CONDITION/INDICATES Control System UnresponsiveUIM Display Is Blank UIM is InoperableAC Reversed Fault MessagesUpper Probe Short Flame Probe ShortEnergy Cut Out ECO Flame Detect ErrorBlocked Inlet Blocked Exhaust Vent Perform ALL These Tests with Power Blower Prover OpenTurned on and a Call for Heat Active Low Igniter Current Rough Starting Rough Operation Note Ignition FailureCheck for 24 VAC to the Gas Valve solenoid coil Communication Failure Gas Valve FailureTennessee Waltz Parkway Ashland City, TN