State Industries GP650HTPDT, SHE50-100PE, SHE50-100NE manual Blocked Inlet

Page 47

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

FAULT MESSAGES (CONT)

DISPLAYED MESSAGE

CHECK/REPAIR

CONDITION/INDICATES

 

 

 

“Blocked Inlet”

• If the water heater has been installed as a con-

 

ventional vent appliance - Ensure the intake air

The control system has detected open contacts at

connection screen is not clogged with debris.

See Service Notes - Venting on page 7.

the Blocked Intake air pressure switch - inadequate

 

supply of intake (combustion) air.

• If water heater has been installed as a direct

 

vent appliance - check for restrictions, too many

 

equivalent feet, or too many elbows in the intake

 

air piping. Review venting installation section of

 

the Instruction Manual that came with the water

 

heater - see Table 1 on page 7 in this manual.

 

Ensure the vent/intake air piping has been

 

installed within manufacturers requirements.

 

• If water heater has been installed as a direct

 

vent appliance - temporarily disconnect the

 

intake air pipe at the blower connection on the

 

water heater - ensure the screen inside the

 

intake air connection was removed during

 

installation. See the Service Notes for venting

 

on page 7.

 

• Check all wiring between the Blocked Intake air

 

pressure switch and the CCB’s J6 Socket (page

 

36) pins 4 & 14. Perform close visual inspection

 

of the pins inside the plug and socket - ensure

 

plugs and sockets are mating properly and pro-

 

viding good contact. Repair/replace anything

 

worn or damaged.

 

• Review the air pressure switch information

 

beginning on page 18. Perform the pressure

 

switch test procedure for the Blocked Intake air

 

pressure switch - see pages 21 through 23.

 

Replace the Blocked Intake switch if defective.

 

• Call the technical support phone number shown

 

on the water heater labeling for further assis-

 

tance if the problem has not been corrected

 

after performing the procedures outlined here.

 

 

Technical Literature Department

46 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Image 47
Contents Service Handbook Ultra High Efficiency Power VENT/POWER Direct Vent Important Service Reminder Qualifications Qualified Service AgentService Warning Tools Required Thermal Expansion Closed Water SystemsContaminated AIR AIR RequirementsMaximum Equivalent Length Requirements VentingNumber Maximum Pipe Elbows Length Feet Meters Service Notes VentingPipe Size Requirements Maximum Elbow RequirementsElectrical Requirements Service Notes ElectricalVAC 1Ø Power Supply Correctly Wired OutletInternal View HOW IT WorksBlower Service Notes BlowerBurner Service Notes Burner Flame SensorOn Next Burner & Blower RemovalBurner/Blower Removal Service Notes Blower Flange & Blower Adapter GasketsBlower VenturiGasket Orifice GAS ValveGas Valve Removal Service Notes Checking Gas Pressures GAS Pressure TestingGas Pressures Service Notes Gas Pressure AdjustmentGAS Pressures Normal State Activated State AIR Pressure SwitchesBlocked Exhaust Switch Blower Prover SwitchBlocked Intake Switch Blower Prover Failure AIR Pressure Switch OperationOperational State Test AIR Pressure Switch TestingNormal State Test Blower Prover Blocked Intake Blocked Exhaust Air Pressure Switch ParametersPressure Test Page Flame Sensor Flame Sensing TestMeasuring Flame Sensing Current Igniter Current Test Service Notes Hot Surface IgnitersIntroduction Control System FeaturesUIM Service Notes Button Pad Ribbon CableDiscreet Menu Contact Information Commercial & Residential Product DifferencesDesktop Screen Service Note Sequence of Operation DisplayStatus Icon Description Status IconsState Description Operational States ModesAction Display Operating SET Point AdjustmentControl System Menus ECO CCB Service Notes CCB ReplacementSocket Identification J10 J13 J15 J11 J16PIN # Description J3 Socket 120 VAC Power SupplyJ1 Socket Transformer J2 Socket 120 VAC To BlowerExt Use Yes Input Type Tstat Open RetryService Notes Polarity & Ground Wiring DiagramYES Sequence of OperationHeater Status Menu Resetting the control systemImportant Service Reminder Rough Starting Rough Operation NoteDisplayed Message CHECK/REPAIR CONDITION/INDICATES Control System UnresponsiveUIM Display Is Blank UIM is InoperableAC Reversed Fault MessagesUpper Probe Short Flame Probe ShortEnergy Cut Out ECO Flame Detect ErrorBlocked Inlet Blocked Exhaust Vent Turned on and a Call for Heat Active Perform ALL These Tests with PowerBlower Prover Open Low Igniter Current Rough Starting Rough Operation Note Ignition FailureCheck for 24 VAC to the Gas Valve solenoid coil Communication Failure Gas Valve FailureTennessee Waltz Parkway Ashland City, TN