State Industries GP650HTPDT, SHE50-100PE, SHE50-100NE manual Sequence of Operation, Yes

Page 41

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

SEQUENCE OF OPERATION

Call for heat initiated

Air Pressure Switch Test Is Performed Blower Prover Switch is verified open

Blocked Intake and Blocked Exhaust Switches are verified closed

YES

Blower Motor is energized

Pre-purge State

 

 

Blower Prover Switch is verified closed

 

 

 

 

 

 

 

 

 

 

 

NO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

YES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Igniter is energized for warm up period

 

 

 

 

 

 

 

 

 

(approx 17 seconds)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Control System (CCB) Verifies Igniter

 

 

 

 

 

 

 

 

 

 

 

 

NO

 

 

 

 

Current at 2.0 AC Amps Minimum

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

YES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gas Valve Is Energized

 

 

 

 

 

 

 

 

 

 

 

Gas Flows To Burner

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Control System (CCB) Verifies Flame

 

 

 

 

 

Sensing Current at 1.0µA DC Micro Amps Minimum

 

 

 

 

 

 

 

 

Control System Declares

 

 

 

Fault Condition - Locks Out

 

 

 

One of the following

 

 

 

Fault Messages Displayed:

NO

 

 

 

 

“Blower Prover Failure”

 

 

 

 

 

 

“Blocked Inlet”

 

 

 

“Blocked Exhaust Vent”

 

 

 

 

 

 

 

 

 

 

 

Control System Declares

 

 

 

Fault Condition - Locks Out

 

 

 

“Blower Prover Open”

 

 

 

Fault Message Displayed

 

 

 

 

Control System Declares

Fault Condition - Locks Out

“Low Igniter Current”

Fault Message Displayed

YES

Water Is Heated To

Operating Set Point

Gas Valve Is

De-energized

Post-Purge State

30 Sec Approx

Control System Goes Into

Standby State/Mode

NO

Gas Valve Is

De-energized

Inter-Purge State

30 Sec Approx

Retries Up To

3 Times

Control System Declares Fault Condition - Locks Out

“Ignition Failure”

Fault Message Displayed

Technical Literature Department

40 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Image 41
Contents Service Handbook Ultra High Efficiency Power VENT/POWER Direct Vent Important Service Reminder Qualifications Qualified Service AgentService Warning Tools Required Thermal Expansion Closed Water SystemsContaminated AIR AIR RequirementsMaximum Equivalent Length Requirements VentingPipe Size Requirements Service Notes VentingMaximum Elbow Requirements Number Maximum Pipe Elbows Length Feet MetersVAC 1Ø Power Supply Service Notes ElectricalCorrectly Wired Outlet Electrical RequirementsInternal View HOW IT WorksBlower Service Notes BlowerBurner Service Notes Burner Flame SensorOn Next Burner & Blower RemovalBurner/Blower Removal Service Notes Blower Flange & Blower Adapter GasketsBlower VenturiGasket Orifice GAS ValveGas Valve Removal Service Notes Checking Gas Pressures GAS Pressure TestingGas Pressures Service Notes Gas Pressure AdjustmentGAS Pressures Normal State Activated State AIR Pressure SwitchesBlocked Exhaust Switch Blower Prover SwitchBlocked Intake Switch Blower Prover Failure AIR Pressure Switch OperationOperational State Test AIR Pressure Switch TestingNormal State Test Blower Prover Blocked Intake Blocked Exhaust Air Pressure Switch ParametersPressure Test Page Flame Sensor Flame Sensing TestMeasuring Flame Sensing Current Igniter Current Test Service Notes Hot Surface IgnitersIntroduction Control System FeaturesUIM Service Notes Button Pad Ribbon CableDiscreet Menu Contact Information Commercial & Residential Product DifferencesDesktop Screen Service Note Sequence of Operation DisplayStatus Icon Description Status IconsState Description Operational States ModesAction Display Operating SET Point AdjustmentControl System Menus ECO CCB Service Notes CCB ReplacementSocket Identification J10 J13 J15 J11 J16J1 Socket Transformer J3 Socket 120 VAC Power SupplyJ2 Socket 120 VAC To Blower PIN # DescriptionExt Use Yes Input Type Tstat Open RetryService Notes Polarity & Ground Wiring DiagramYES Sequence of OperationImportant Service Reminder Resetting the control systemRough Starting Rough Operation Note Heater Status MenuUIM Display Is Blank Control System UnresponsiveUIM is Inoperable Displayed Message CHECK/REPAIR CONDITION/INDICATESAC Reversed Fault MessagesUpper Probe Short Flame Probe ShortEnergy Cut Out ECO Flame Detect ErrorBlocked Inlet Blocked Exhaust Vent Turned on and a Call for Heat Active Perform ALL These Tests with PowerBlower Prover Open Low Igniter Current Rough Starting Rough Operation Note Ignition FailureCheck for 24 VAC to the Gas Valve solenoid coil Communication Failure Gas Valve FailureTennessee Waltz Parkway Ashland City, TN