State Industries GP650HTPDT, SHE50-100PE, SHE50-100NE manual Low Igniter Current

Page 50

ULTRA HIGH EFFICIENCY POWER VENT/POWER DIRECT VENT - SERVICE MANUAL

FAULT MESSAGES (CONT)

DISPLAYED MESSAGE

CHECK/REPAIR

CONDITION/INDICATES

 

 

 

“Low Igniter Current”

• Check all wiring between CCB’s J5 Socket

 

(page 35) pins 1 & 2 and the hot surface igniter.

The control system has detected less than 2.0 AC

Repair/replace anything worn or damaged as

necessary.

amps through the igniter during the igniter warm up

 

period.

• Perform close visual inspection of the pins

 

inside the CCB J5 plug and socket - ensure

 

plugs and sockets are mating properly and pro-

 

viding good contact. Repair/replace anything

 

worn or damaged as necessary.

 

• With power turned on and a call for heat active -

 

ensure there is 120 VAC between pins 1 & 2 of

 

the CCB’s J5 Socket during the igniter warm up

 

period. - the igniter lighting bolt icon will appear

 

on the UIM display during the igniter warm up

 

period. See Table 4 on page 30.

 

• Turn off power to the water heater - disconnect

 

wires to igniter at the igniter. Check for continu-

 

ity between the two igniter wires. If the igniter

 

shows to be an open circuit - replace the igniter.

 

• With power turned on and a call for heat active -

 

check amp draw through the igniter with an AC

 

amp meter during the igniter warm up period.

 

This procedure is illustrated and explained on

 

page 25. Replace igniter if amp draw is less

 

than 3.0 AC amps.

 

• Call the technical support phone number shown

 

on the water heater labeling for further assis-

 

tance if the problem has not been corrected

 

after performing the procedures outlined here.

 

 

Technical Literature Department

49 of 52

Ashland City, TN © 2008

Servicing should only be performed by a Qualified Service Agent

 

Image 50
Contents Service Handbook Ultra High Efficiency Power VENT/POWER Direct Vent Important Service Reminder Qualifications Qualified Service AgentService Warning Tools Required Closed Water Systems Thermal ExpansionAIR Requirements Contaminated AIRVenting Maximum Equivalent Length RequirementsMaximum Elbow Requirements Service Notes VentingPipe Size Requirements Number Maximum Pipe Elbows Length Feet MetersCorrectly Wired Outlet Service Notes ElectricalVAC 1Ø Power Supply Electrical RequirementsHOW IT Works Internal ViewService Notes Blower BlowerService Notes Burner Flame Sensor BurnerBurner & Blower Removal On NextService Notes Blower Flange & Blower Adapter Gaskets Burner/Blower RemovalVenturi BlowerGasket Orifice GAS ValveGas Valve Removal GAS Pressure Testing Service Notes Checking Gas PressuresGas Pressures Service Notes Gas Pressure AdjustmentGAS Pressures AIR Pressure Switches Normal State Activated StateBlocked Exhaust Switch Blower Prover SwitchBlocked Intake Switch AIR Pressure Switch Operation Blower Prover FailureOperational State Test AIR Pressure Switch TestingNormal State Test Blower Prover Blocked Intake Blocked Exhaust Air Pressure Switch ParametersPressure Test Page Flame Sensor Flame Sensing TestMeasuring Flame Sensing Current Service Notes Hot Surface Igniters Igniter Current TestControl System Features IntroductionService Notes Button Pad Ribbon Cable UIMCommercial & Residential Product Differences Discreet Menu Contact InformationService Note Sequence of Operation Display Desktop ScreenStatus Icons Status Icon DescriptionOperational States Modes State DescriptionOperating SET Point Adjustment Action DisplayControl System Menus ECO Service Notes CCB Replacement CCBJ10 J13 J15 J11 J16 Socket IdentificationJ2 Socket 120 VAC To Blower J3 Socket 120 VAC Power SupplyJ1 Socket Transformer PIN # DescriptionRetry Ext Use Yes Input Type Tstat OpenWiring Diagram Service Notes Polarity & GroundSequence of Operation YESRough Starting Rough Operation Note Resetting the control systemImportant Service Reminder Heater Status MenuUIM is Inoperable Control System UnresponsiveUIM Display Is Blank Displayed Message CHECK/REPAIR CONDITION/INDICATESFault Messages AC ReversedFlame Probe Short Upper Probe ShortFlame Detect Error Energy Cut Out ECOBlocked Inlet Blocked Exhaust Vent Turned on and a Call for Heat Active Perform ALL These Tests with PowerBlower Prover Open Low Igniter Current Ignition Failure Rough Starting Rough Operation NoteCheck for 24 VAC to the Gas Valve solenoid coil Gas Valve Failure Communication FailureTennessee Waltz Parkway Ashland City, TN